My house which is under elevation construction stage all three sides external plastering is done except front side where in elevation work is going on . Now the some portion of wall where elevation isrequired the mestri has drilled 3 inch deep holes in wall and 12 mm in dia 9 inch in length steel rods and then he has used steel rods and steel mesh to get projected shape , now he has not plastered the wall for projected area , Now I suspect that the rain water might seep in between wall and project area and walls will be wet , Mestri says water will not seep in between wall and projected area
Need a suggestion /recomendation here .
regards
Nitin
plastering for wall
Re: plastering for wall
i think you better get it plastered even if you have the slightest of doubts. it doesn't cost him a lot either.
-
- Posts: 125
- Joined: August 23rd, 2012, 4:34 pm
Re: plastering for wall
he should fill the gaps with cement and sand mix and plastering can be done later on
Re: plastering for wall
Use FOSROCK SBR while plastering. U can use lock fix chemical to fix the reinforcement
Re: plastering for wall
Hi Ravi /Nag
Thanks for the response he has removed the mesh and cement and is doing plastering on the wall now . I had tested wall by pouring water and there was seepage so he has agreed to wall palstering as well
thanks
Nitin
Thanks for the response he has removed the mesh and cement and is doing plastering on the wall now . I had tested wall by pouring water and there was seepage so he has agreed to wall palstering as well
thanks
Nitin