Contractor quotation - need feedback

Post Reply
krishnakumar
Posts: 83
Joined: April 25th, 2011, 4:11 pm

Contractor quotation - need feedback

Post by krishnakumar »

Hi

I have attached here a copy of quotation i got from a friend. He has got it from a contractor and I am planning to go to the same person. Could you please review and let me know the positive and negatives of this quotation, what points i can negotiate on, and if it seems reasonable.

Your feed back will help me greatly.

Thanks
Krishna
Attachments
quote_others.pdf
(495.29 KiB) Downloaded 949 times
ausraja
Posts: 217
Joined: December 14th, 2013, 8:56 am

Re: Contractor quotation - need feedback

Post by ausraja »

Your quotation looks like a standard one in the industry.One good point is he is using red bricks which many contractors don't use and recommend cement blocks to save labor.

you can ask for the below :

Agreed rate for stilt floor = 70% and not 80%
TMT steel - Ask him Indus steel
Galzed tiles - ask him for 50 rs and not 40 rs
Kitchen - ask him granite sink and not steel because steel makes a lot of noise and is not durable as that of granite
ask him for a gate also

In addition to this if you can reduce the rate to 5 t0 10K from the existing 1,55K then it will be great as most of the things are common across bangalore.
krishnakumar
Posts: 83
Joined: April 25th, 2011, 4:11 pm

Re: Contractor quotation - need feedback

Post by krishnakumar »

Thanks ausraja for the feedback. Even I felt stilt is a bit costly. I will negotiate based on these points. Any other feedback please?
pv_prasanna
Posts: 16
Joined: November 20th, 2010, 8:46 am

Re: Contractor quotation - need feedback

Post by pv_prasanna »

Hi Martin,
Your statement "I had a Architect & his structural engineers who created the work plan,3D Elevation, Plan for Panchayat building plan approval (As my site is BMRDA approved Site) it costed me 20K. I also got an estimate from him " Could you provide details of the architect please? my mail is venkaprasanna at gmail dot com.

Thanks
venkatesh
krishnakumar
Posts: 83
Joined: April 25th, 2011, 4:11 pm

Re: Contractor quotation - need feedback

Post by krishnakumar »

After all the leg work I am almost near to start construction. After a few additions mainly additional windows, gas piping work, separate drinking water sump and tank etc the final price went up by another 3-4lac. I was able to get few additional things like gate tiles for parking and stairs etc. But i am still not able to negotiate on the stilt flooring price. I am a bit sceptical about paying 80% of agreed rate for stilt. Please let me know your thoughts about the overall price. One good thing was although the quotation was 8 months old the agreed rate remains same. It would really help to get some feedback on the overall rate.
Post Reply

Return to “Civil Construction”