Construction material prices
Re: Construction material prices
we accept MR praveen comments
Re: Construction material prices
sam_m400,
The steel prices have again increased as the rate is 46000 /ton for 415 ISI TMT now whereas it was 43800/ton 2 weeks back.
The steel prices have again increased as the rate is 46000 /ton for 415 ISI TMT now whereas it was 43800/ton 2 weeks back.
Re: Construction material prices
m3_7, praveen, Sriram,
I have given item-wise contract(material+labour) for Civil work and labour contract for carpentry, Electrical, Plumbing, Tiles. Even in item-wise contract, the steel is supplied by me and also the brick supplier, cement brands are fixed and also curing time/frequency. Also cement/sand/Jally mixing ratio is monitored very closely. During footing/plinth/roof/column cating work, one of my friend used to check the mixing ratio used by the gang for each load. Also every load of sand is inspected for excess mud content. My architect who is also structural engineer visits on need basis or every 2 weeks.
I am in the stage where Civil works are almost complete while rest are in progress. I feel, one certainly needs to monitor the construction personally or by a reliable site supervisor/engineer/relative daily if the contract is NOT full contract to ensure that quality work is carried out. I also find that having a watchman who is also experienced mason working in the construction helps have additional channel of info in addition to the site supervisor. It does require a lot of personal time to monitor the construction on daily basis as well as to supply material to Electrician/Carpenter. Last but not the least, it is desirable if architect, civil contractor, watchman and others are appointed independently/directly from your known sources to get unbiased inputs during the construction and also to have better control on them.
Hopefully this model works !
Regards,
Selva
I have given item-wise contract(material+labour) for Civil work and labour contract for carpentry, Electrical, Plumbing, Tiles. Even in item-wise contract, the steel is supplied by me and also the brick supplier, cement brands are fixed and also curing time/frequency. Also cement/sand/Jally mixing ratio is monitored very closely. During footing/plinth/roof/column cating work, one of my friend used to check the mixing ratio used by the gang for each load. Also every load of sand is inspected for excess mud content. My architect who is also structural engineer visits on need basis or every 2 weeks.
I am in the stage where Civil works are almost complete while rest are in progress. I feel, one certainly needs to monitor the construction personally or by a reliable site supervisor/engineer/relative daily if the contract is NOT full contract to ensure that quality work is carried out. I also find that having a watchman who is also experienced mason working in the construction helps have additional channel of info in addition to the site supervisor. It does require a lot of personal time to monitor the construction on daily basis as well as to supply material to Electrician/Carpenter. Last but not the least, it is desirable if architect, civil contractor, watchman and others are appointed independently/directly from your known sources to get unbiased inputs during the construction and also to have better control on them.
Hopefully this model works !
Regards,
Selva
-
- Posts: 35
- Joined: March 17th, 2010, 1:58 pm
Re: Construction material prices
Very well said Selva...
Thanks for sharing your experience..!! and very valuable suggestions..!!
Hope this shall be the starting point for someone who wishes to start on their own
Keep up the good work..!!
Regards
Gopal
Thanks for sharing your experience..!! and very valuable suggestions..!!
Hope this shall be the starting point for someone who wishes to start on their own
Keep up the good work..!!
Regards
Gopal
-
- Posts: 35
- Joined: March 17th, 2010, 1:58 pm
Re: Construction material prices
Friends,
I strongly recommend BHARATH TRADERS for all plumbing materials (in South Bangalore), who gave me good materials and considerbly a great price (when compared with other vendors in the vicinity)..!!
Please let me know if you need the contact person there...
Thank you, Have a Good Day
Regards
Gopal Sumukha
I strongly recommend BHARATH TRADERS for all plumbing materials (in South Bangalore), who gave me good materials and considerbly a great price (when compared with other vendors in the vicinity)..!!
Please let me know if you need the contact person there...
Thank you, Have a Good Day
Regards
Gopal Sumukha
-
- Posts: 210
- Joined: June 18th, 2009, 1:27 pm
Re: Construction material prices
Gopal, Please send the store address and contact person.
Thanks!
Thanks!
-
- Posts: 35
- Joined: March 17th, 2010, 1:58 pm
Re: Construction material prices
Rajesh,
Sent across the details as PM, pls chk
Thanks
Gopal Sumukha
9986001417
Sent across the details as PM, pls chk
Thanks
Gopal Sumukha
9986001417
-
- Posts: 370
- Joined: January 24th, 2012, 11:57 am
Re: Construction material prices
bought 30bags zuari 43 grade for rs 325
i just dont trust anybody i monitor evrything bymyself i visit my site 2 times in a day morning before mixing the cement and wil lget to know the work need to be done and later in the evenin i will seee ther work n as well monitor the materials they have used especially cement n after 2 floors got to know quantity of steel,cement might consume for each floor so according to that i provide materials .... sometimes its difficult to get good work from them n also some time they do waste materials especially cement ...n i keep track on materials ....i have seen few workers especially watchman sellin steel n few plastic pipes electrical n plumbing materials to scrap shop ... keep materials in safe place n dont give any oppurtunity to these workers or any outsiders
i just dont trust anybody i monitor evrything bymyself i visit my site 2 times in a day morning before mixing the cement and wil lget to know the work need to be done and later in the evenin i will seee ther work n as well monitor the materials they have used especially cement n after 2 floors got to know quantity of steel,cement might consume for each floor so according to that i provide materials .... sometimes its difficult to get good work from them n also some time they do waste materials especially cement ...n i keep track on materials ....i have seen few workers especially watchman sellin steel n few plastic pipes electrical n plumbing materials to scrap shop ... keep materials in safe place n dont give any oppurtunity to these workers or any outsiders
-
- Posts: 250
- Joined: October 24th, 2010, 6:37 pm
Re: Construction material prices
ACC PPC Cement Rs.335 per bag.
-
- Posts: 370
- Joined: January 24th, 2012, 11:57 am
Re: Construction material prices
steel 45.5k per ton for isi brands 500grade
jelly RS25 percft
birla super 53 grade rs340 for 50+ bags
sand 450+cft rs23200 per load
jelly RS25 percft
birla super 53 grade rs340 for 50+ bags
sand 450+cft rs23200 per load