RMC roof concrete develops cracks in few hours.

Post Reply
kumarraja
Posts: 66
Joined: May 12th, 2015, 3:10 pm

RMC roof concrete develops cracks in few hours.

Post by kumarraja »

Cracks have developed few hours after pouring RMC concrete.
sandeeper
Posts: 9
Joined: May 27th, 2015, 10:48 pm

Re: RMC roof concrete develops cracks in few hours.

Post by sandeeper »

Due to high temperature cracks are common during concreting .
kumarraja
Posts: 66
Joined: May 12th, 2015, 3:10 pm

Re: RMC roof concrete develops cracks in few hours.

Post by kumarraja »

Are these cracks dangerous for the structure ?
User avatar
ardesarchitects
Posts: 1080
Joined: June 20th, 2009, 2:12 pm

Re: RMC roof concrete develops cracks in few hours.

Post by ardesarchitects »

Hi ,
Cracks in the concrete are common when temperatures are high.you can sprinkle the water sparsely not much for first 4-5 hours .After 1-2 hour you need to tap the whole slab casting for better compaction .
After 8-10 hrs you can start curing by storing water on top of slab .
Cracks on the roof are not going to effect the structure in anyways ,please check for any heavy slurry leaks from centering to avoid honey combs

Regards
Ar.Praveen.N
Ardes Architects and Interior designers
ardesarchitects@gmail.com
https://www.facebook.com/ardes.architects
http://www.ardesarchitects.com
kumarraja
Posts: 66
Joined: May 12th, 2015, 3:10 pm

Re: RMC roof concrete develops cracks in few hours.

Post by kumarraja »

Dear Arch praveen,

What do you exactly mean by " tap the slab" ?
sandeeper
Posts: 9
Joined: May 27th, 2015, 10:48 pm

Re: RMC roof concrete develops cracks in few hours.

Post by sandeeper »

As u said cracks appeared in few hours after pouring concrete , so there is nothing to worry about structure .
kvanbu
Posts: 12
Joined: September 22nd, 2015, 12:30 am

Re: RMC roof concrete develops cracks in few hours.

Post by kvanbu »

Kumar,

You need to cover the concrete with tarpaulin(blue sheet) and sprinkle water immediately on the sheet if you are putting concrete when temperature is high (before 4 PM). After 4 PM is the best time to put slab concrete. Curing has to be started immediately after the bleeding water goes away. Bleeding water will not evaporate immediately in the evening. You need to sprinkle water if one can walk on that. I have used RMC for my G + 3 and there was no crack. I have followed above said curing method as instructed by RMC company. I did the concrete in the evening. I have added waterproof and fiber in the RMC for all my slabs.

Thanks
kumarraja
Posts: 66
Joined: May 12th, 2015, 3:10 pm

Re: RMC roof concrete develops cracks in few hours.

Post by kumarraja »

What is that fiber you are talking about ?
There is no RMC transit truck which can deliver after 4 PM when the traffic is at its peak, trucks not allowed to ply inside city.
User avatar
ardesarchitects
Posts: 1080
Joined: June 20th, 2009, 2:12 pm

Re: RMC roof concrete develops cracks in few hours.

Post by ardesarchitects »

Hi,
Tapping i mean mason takes his levling bar (matkol)and keep compacting rcc by applying pressure .


Regards
Ar.Praveen.N
Ardes Architects and Interior designers
ardesarchitects@gmail.com
https://www.facebook.com/ardes.architects
http://www.ardesarchitects.com
Post Reply

Return to “Civil Construction”