Electrical & plumbing cost

Post Reply
tara_m
Posts: 29
Joined: December 5th, 2013, 11:55 am

Electrical & plumbing cost

Post by tara_m »

Dear Forum members
I have a doubt regarding the cost of Electrical &plumbing
is it calculated from overall cost(Finishing +Structural ) or just the Structural cost ?
generally the thumb rule is they charge you 10% right? i really dont understand how the finishing has anythin to do with Electrical work :? can some one please throw some light on this ?
venkyn
Posts: 305
Joined: September 11th, 2010, 2:50 pm

Re: Electrical & plumbing cost

Post by venkyn »

I did my own estimation, but looks like i can reduce a lot based on material. In brief, on bathroom and kitchen you can spend a lot
based on the taste. If resort kind of finishing and facilities are required then you indeed require more for plumbing.

Here is an estimation which i did, may not be exact.

Kitchen Sink 12000 2 24000
Western Comod 8000 6 48000
10 sinks 4000 10 40000
Taps 3000 20 60000
Frameless Shower 20000 2 40000
Bath Tub 100000 1 100000
Booster Pump 20000 1 20000
geyzer 8000 3 24000
Pipes 40000
Sanatry 40000
Overhead tank 7000 2 14000
Water Proof 50000
Sump 20 8000 160000
Total 660000
maheshv
Posts: 220
Joined: September 7th, 2010, 9:32 pm

Re: Electrical & plumbing cost

Post by maheshv »

at 10% or 15% cost of structure, they do not consider bathroom fittings, kitchen fitting, overhead tank, sump etc., it's only for freshwater pipe and drainage - cutting wall, running the pipe and plastering pipe, that's it,. Also if you ask for change like, getting hot water to wash basin or kitchen, it will be extra charge as they need to run addition pipe.
Similarly electric work will get you wire, pipe conduit, switch box and switches. No main electric box, meter, permanent connection, bulb holder, fan, lights etc., Again you do not have clarity on what gauge wire are run. for example, in kitchen where you need more power you need to run higher gauge wires (thinker ones)

Better you get a lump sump labor contract with a dedicated plumber and electrician and complete the work. it will cost less (electrician and plumber will charge you around 30 to 50k for ~ 2500 to 3000sqft house) and they will do the above work and you need to supply items
Post Reply

Return to “Civil Construction”