Dear Sir,
I intend to go for 2 nd floor construction on existing gnd/Ist floor house on 30'x41' Plot.
There are no pillars and 2nd floor plan (10 squares)is similar to 1st Floor plan - building walls on existing walls.
I have enclosed the contract rates for various works .Please comment whether these rates are OK and reasonable for 2nd floor construction in H S R Layout sector -7.
I really appreciate your expert comments.
Thanks
from
k s manjunatha
CONTRACT RATES FOR 2ND FLOOR HOUSE CONSTRUCTION
-
- Posts: 508
- Joined: July 18th, 2009, 2:23 am
Re: CONTRACT RATES FOR 2ND FLOOR HOUSE CONSTRUCTION
Check out the thread under construction
http://www.mybdasites.com//viewtopic.php?f=36&t=1135
hope that helps.
http://www.mybdasites.com//viewtopic.php?f=36&t=1135
hope that helps.
Re: CONTRACT RATES FOR 2ND FLOOR HOUSE CONSTRUCTION
Some of points that I noticed in your listing:
1. Cieling area is 1215 sft. How come flooring area does not add up to this number?
2. Electrical/plumbing/Sanitary: shouldnt this be quantified correctly? How many electrical points - light, sockets, fan / room; 5A or 15A; which switchgear to be used? brand & gauge of cabling used; Changes in the distribution panel? How many bathrooms? what kind & brand of fixtures in the bathroom?
3. What kind of Kitchen sink? what dimension? --- OR Are all these items (switchgear, bathroom fittings, plumbing items etc to eb supplied by you?
As a guideline, i would suggest you to specify explicit brand, quality/model details and #s to be sure of what you end up getting at the end of this.
1. Cieling area is 1215 sft. How come flooring area does not add up to this number?
2. Electrical/plumbing/Sanitary: shouldnt this be quantified correctly? How many electrical points - light, sockets, fan / room; 5A or 15A; which switchgear to be used? brand & gauge of cabling used; Changes in the distribution panel? How many bathrooms? what kind & brand of fixtures in the bathroom?
3. What kind of Kitchen sink? what dimension? --- OR Are all these items (switchgear, bathroom fittings, plumbing items etc to eb supplied by you?
As a guideline, i would suggest you to specify explicit brand, quality/model details and #s to be sure of what you end up getting at the end of this.