Starting House Construction
-
- Posts: 91
- Joined: March 25th, 2010, 9:42 am
Re: Starting House Construction
Thank you Chida_gs.
-
- Posts: 91
- Joined: March 25th, 2010, 9:42 am
Re: Starting House Construction
Friends,
I have to finalise on the designs of the front door, pooja door & the windows grill.
Need your inputs on the options available, if I can have a look at some good ones based on which i can finalise.
Regards,
Vajra
I have to finalise on the designs of the front door, pooja door & the windows grill.
Need your inputs on the options available, if I can have a look at some good ones based on which i can finalise.
Regards,
Vajra
-
- Posts: 91
- Joined: March 25th, 2010, 9:42 am
Re: Starting House Construction
Sub: Slab/Roofing casting
Dear friends,
Our roofing/slab got completed yesterday. Fortunately, till the completion of the roofing it did not rain at all.
However, about 3 hours after the completion of roofing, it started raining(drizling) again. Wanted to know, if that was ok, or is there any issue.
Regards,
Vajra
Dear friends,
Our roofing/slab got completed yesterday. Fortunately, till the completion of the roofing it did not rain at all.
However, about 3 hours after the completion of roofing, it started raining(drizling) again. Wanted to know, if that was ok, or is there any issue.
Regards,
Vajra
-
- Posts: 91
- Joined: March 25th, 2010, 9:42 am
Re: Starting House Construction
Hi Freinds,
Wanted to know your valuable inputs on time required to complete the construction. The following activites are pending to be completed.
1) Electrical works (points & pipes) are in progress
2) Plumbing
3) Internal Plastering
4) External Plastering
5) Doors fixing (Only front and puja room door frames are fixed as of now)
6) Tiles purchase and tiles fixing
7) First coat Painting
8) Final coat painting
Note : Total area ( 1900 sft) G+1
Regards,
Vajra
Wanted to know your valuable inputs on time required to complete the construction. The following activites are pending to be completed.
1) Electrical works (points & pipes) are in progress
2) Plumbing
3) Internal Plastering
4) External Plastering
5) Doors fixing (Only front and puja room door frames are fixed as of now)
6) Tiles purchase and tiles fixing
7) First coat Painting
8) Final coat painting
Note : Total area ( 1900 sft) G+1
Regards,
Vajra
-
- Posts: 91
- Joined: March 25th, 2010, 9:42 am
Re: Starting House Construction
Hi Friends,
Glad to let you all know, that my duplex house construction is completed & I have moved in to the new house.
I am happy with the engineer work, overall the house has come up well.
I will be more than happy to suggest/share points related to construction of the house.
You can PM me.
Regards,
Vajra
Glad to let you all know, that my duplex house construction is completed & I have moved in to the new house.
I am happy with the engineer work, overall the house has come up well.
I will be more than happy to suggest/share points related to construction of the house.
You can PM me.
Regards,
Vajra
Re: Starting House Construction
Hi,
Could you please post some of your new House pictures.
Could you please post some of your new House pictures.
Re: Starting House Construction
Hi,
Congrats on shifting to your new house.
Do you have the tile layer number. i have 2 floors to be completed one with granite and one with vitrified.
was looking for a good trustable tile layer.
Thanks and Regards
Asif
9980003905
Congrats on shifting to your new house.
Do you have the tile layer number. i have 2 floors to be completed one with granite and one with vitrified.
was looking for a good trustable tile layer.
Thanks and Regards
Asif
9980003905