Our House construction experience

ravivasudeva
Posts: 125
Joined: August 23rd, 2012, 4:34 pm

Re: Our House construction experience

Post by ravivasudeva »

Gas pipeline quotation

Today I met a Gas pipeline vendor who quoted the following rates for 70 running feet

Copper pipe guage of 7kgs (14 G) - 9800
OR
Copper pipe guage of 6Kgs (14 G) - 8400

Others,
Balvalue - 1750 for 5 nos
Bull Nozzel (Brass) - 625 for 5 nos
Pinset - 500 for 5 nos
T. Joint - 300 for 1 nos
Breging Brass Nut - 1000 for 8 nos

If you are aware of any better deals and tips on this, kindly share...I still haven't checked with other vendors which i will do in coming days.
Last edited by ravivasudeva on January 31st, 2015, 10:44 pm, edited 1 time in total.
ravivasudeva
Posts: 125
Joined: August 23rd, 2012, 4:34 pm

Re: Our House construction experience

Post by ravivasudeva »

Current progress

Internal plastering has started and at the same time we are starting work on Elevation walls...few pictures from the site
North East
North East
IMG_20150130_081835392_HDR.jpg (144.3 KiB) Viewed 9314 times
South side
South side
IMG_20150130_081812998_HDR.jpg (146.04 KiB) Viewed 9314 times
East side
East side
IMG_20150130_081855011_HDR.jpg (167.38 KiB) Viewed 9314 times
ravivasudeva
Posts: 125
Joined: August 23rd, 2012, 4:34 pm

Re: Our House construction experience

Post by ravivasudeva »

Grill design
Attachments
Grill design
Grill design
IMG_20150130_073728714.jpg (228.43 KiB) Viewed 10440 times
mantu_bangalore
Posts: 8
Joined: February 24th, 2015, 12:17 am

Re: Our House construction experience

Post by mantu_bangalore »

Hai,

This is your own house so please go with good Quality upvc, i
saw all brand of upvc so i am telling LG is good bcz own hardware's, good
sound proof. 10 years guaranty, smooth operating, others, you will got some feel of good Quality upvc, if you want more information, contact xxxxxx

Edited by ADMIN
ravivasudeva
Posts: 125
Joined: August 23rd, 2012, 4:34 pm

Re: Our House construction experience

Post by ravivasudeva »

Happy Ugadi to dear members.

After we started plastering, we ran out of Sand and unfortunately my contractor didn't had an idea, so he didn't stock the sand :(
We had to stop the work for couple of weeks and later managed to get sand ofcourse at a higher price. Now the internal plastering is closing to end and plumbing work has started.
In the meantime i had visited many shops (from various references) to look for Tiles, sanitary-ware etc but wasn't satisfied with pricing and collections. Finally narrowed down on a shop close to JSS circle, kanakapura road and bought the following materials.

Kitchen and Utility Sinks from Carysil brand

Glazed Ceramic tiles - 800mm * 1200 mm For flooring, bought a satin finish (600 * 600 ) for Kitchen and pine wooden look alike (600 * 600) )for Bedrooms. Somany Brand

Vitrified wall and floor tiles for bathroom with highlighter tiles - all are 300 mm * 300 mm. All from Somany brand

Wall hung Commode and Concealed tanks from Cera brand

Vitrified tiles for Puja room walls - 600 mm * 600 mm from Tocco brand

Other Accessories
rrprakash
Posts: 54
Joined: October 16th, 2012, 8:07 am

Re: Our House construction experience

Post by rrprakash »

Hi,

I am also constructing a house in Bangalore. Can you indicate model name and approx. cost for the tiles you have selected which will be very much helpful.

Regards

RR Prakash
ravivasudeva
Posts: 125
Joined: August 23rd, 2012, 4:34 pm

Re: Our House construction experience

Post by ravivasudeva »

rrprakash wrote:Hi,

I am also constructing a house in Bangalore. Can you indicate model name and approx. cost for the tiles you have selected which will be very much helpful.

Regards

RR Prakash
Hi Prakash,
It would be difficult for me to list out all the models here...cost wise Somany Ultra large floor tiles costs me 101 per sqft including VAT and rest of them in the range of 60 to 65 per sqft including VAT.
Wall mounted Western toilet costed me 6,500 including VAT.
rrprakash
Posts: 54
Joined: October 16th, 2012, 8:07 am

Re: Our House construction experience

Post by rrprakash »

Thanks for the feedback.

Regards
nagzzz
Posts: 116
Joined: January 24th, 2014, 10:03 am

Re: Our House construction experience

Post by nagzzz »

dear Ravi,
I just saw your earlier post and checked that you had enquired about the gas Piping for your house.
Most of them charge 120-150 persqft which basically includes material + fitting. so i feel the vendor is asking too much.
btw, have you finalized?
ravivasudeva
Posts: 125
Joined: August 23rd, 2012, 4:34 pm

Re: Our House construction experience

Post by ravivasudeva »

Yes, the gas pipeline is laid with some discount on the previous rates.