Finally Started my construction a Duplex 30X50 site in EC...
Re: Finally Started my construction a Duplex 30X50 site in E
Hi,
Regarding the Lintels, Don't know where are all places you planned inside the House (Rooms, Kitchen).
I hope you have considered where the Wardrobes will put later & Cot will be placed in the Rooms.
Lintel should come North side of the Wall in the Rooms as Usually nobody will sleep putting Head towards North Side.
Sometimes Lintels will become constraint for the Interiors design, If you want to modify later during wood work.
Moreover now a days it is avoided as you need to make the frames for the Lintels to make it box
Since it is initial, just check & proceed before putting the Mould for this.
Regarding the Lintels, Don't know where are all places you planned inside the House (Rooms, Kitchen).
I hope you have considered where the Wardrobes will put later & Cot will be placed in the Rooms.
Lintel should come North side of the Wall in the Rooms as Usually nobody will sleep putting Head towards North Side.
Sometimes Lintels will become constraint for the Interiors design, If you want to modify later during wood work.
Moreover now a days it is avoided as you need to make the frames for the Lintels to make it box
Since it is initial, just check & proceed before putting the Mould for this.
Re: Finally Started my construction a Duplex 30X50 site in E
Hi,m_d1982 wrote:Curing the pillars using Jute sacks.. Contractor said he will do it thrice a day..
What is the Cement/Sand/Jelly mix ratio that was used for columns?
regards,
Anand
Re: Finally Started my construction a Duplex 30X50 site in E
Hi Martin,
Can you share the width of the staircase well and width of the each thread. They have come very well. Your living room
looks broad and vibrant.
Regards,
Venky
Can you share the width of the staircase well and width of the each thread. They have come very well. Your living room
looks broad and vibrant.
Regards,
Venky
Re: Finally Started my construction a Duplex 30X50 site in E
@ Chida_gs.
I have chejjas inside the kitchen initially planned for a "L" shape. But i think i will ask them only on one of the walls. I dont want it to be constraint latter while fitting the modern kitchen cabinets/boxes. In the room i putting it as per the plan received from Architect where he has marked the wardrobe to be fixed. however in the masterbedroom on the top will not have any chejjas.
@ Anand. its 1:3:4 mix ratio
@ Venky. Thankyou, Width i think its 1 and half feet,i will check and let u know. The thickness for chain staircase i have asked for 3 inches
I have chejjas inside the kitchen initially planned for a "L" shape. But i think i will ask them only on one of the walls. I dont want it to be constraint latter while fitting the modern kitchen cabinets/boxes. In the room i putting it as per the plan received from Architect where he has marked the wardrobe to be fixed. however in the masterbedroom on the top will not have any chejjas.
@ Anand. its 1:3:4 mix ratio
@ Venky. Thankyou, Width i think its 1 and half feet,i will check and let u know. The thickness for chain staircase i have asked for 3 inches
Regards,
Martin
Martin
Re: Finally Started my construction a Duplex 30X50 site in E
Hi Martin,
Could you please share the architect's contact/address and cement block manufacturer's contact/address to balajics at yahoo dot com ?
Regards, Balaji
Could you please share the architect's contact/address and cement block manufacturer's contact/address to balajics at yahoo dot com ?
Regards, Balaji
Re: Finally Started my construction a Duplex 30X50 site in E
Lintel work completed. Centring work for moulding to start on friday
- Attachments
-
- External staircase 1
- Externals staircase rods.jpg (396.22 KiB) Viewed 6762 times
-
- Internal Staircase 2
- Internal staircase concrete.jpg (293.89 KiB) Viewed 6762 times
-
- Internal staircase 1
- Rings for internal staircase.jpg (352.71 KiB) Viewed 6762 times
Regards,
Martin
Martin
Re: Finally Started my construction a Duplex 30X50 site in E
Lintel work completed..
One week delay due to the Axis bank lead time....
One week delay due to the Axis bank lead time....
- Attachments
-
- chejja
- Bed room chejja.jpg (277.06 KiB) Viewed 6762 times
-
- External staircase 2
- External staircase concrete.jpg (287.05 KiB) Viewed 6762 times
Regards,
Martin
Martin
Re: Finally Started my construction a Duplex 30X50 site in E
Martin , quality of work looks good.
Re: Finally Started my construction a Duplex 30X50 site in E
Hey Martin,m_d1982 wrote:Lintel work completed. Centring work for moulding to start on friday
The rings used for internal staircase and not for external staircase, was it designed by the Architect and given to you through Structural drawings or done solely by the contractor?
Ramki
Re: Finally Started my construction a Duplex 30X50 site in E
@ausraja, Thanks
@Ramki - The rings were done by the contractor. We had discussed along with my uncle who is into construction work in Kerala. The thickness will be around 3 1/2 inches with granite finished it will be 4 inches.
@Ramki - The rings were done by the contractor. We had discussed along with my uncle who is into construction work in Kerala. The thickness will be around 3 1/2 inches with granite finished it will be 4 inches.
Regards,
Martin
Martin