What is payya laying charge?

Post Reply
sam_m400
Posts: 493
Joined: April 6th, 2010, 2:21 pm

What is payya laying charge?

Post by sam_m400 »

1. My contractor is quote 40 Rs per Cub:ft for payya .Is this correct price ?
As i am planning for payya of 3 feet (40 lenth*3 (height) *2(width) ) which would come on one side 240*40 = 9600
Rupess for 3 feet ,and this seems to be very high. Is this correct rate?

2. Compound wall also he is charging 40 Rs per Sq:ft

means 40*5 (height) * 9" inch wall = 200*40 = 8000 Rupees is coming.
sam_m400
Posts: 493
Joined: April 6th, 2010, 2:21 pm

Re: What is payya laying charge?

Post by sam_m400 »

Please do help ,,,,,,,,,,,,,,,,,,,,
User avatar
jult
Posts: 120
Joined: July 21st, 2012, 3:42 pm

Re: What is payya laying charge?

Post by jult »

wht are the item includes
is it earth wokk
pcc
masonary


for compound wall

is it 2 sideplastering included
BengaluruBoy
Posts: 210
Joined: June 18th, 2009, 1:27 pm

Re: What is payya laying charge?

Post by BengaluruBoy »

I'm paying rs 80/cft for SSM ( i think you are referring to same thing by payya) inclusing the materials.
sam_m400
Posts: 493
Joined: April 6th, 2010, 2:21 pm

Re: What is payya laying charge?

Post by sam_m400 »

Payya = Foundation and above brick wall (Compound wall). Are you referring to it ? Is 80 Ft is together (Compound brick wall+foundation )?
BengaluruBoy
Posts: 210
Joined: June 18th, 2009, 1:27 pm

Re: What is payya laying charge?

Post by BengaluruBoy »

I'm not talking about the compund wall. I meant only foundation work (SSM) uing Size stone below plinth beam, walls etc and I don't know the meaning on Payya.

In kannada, paaya means the foundation only with out brick wall.
sam_m400
Posts: 493
Joined: April 6th, 2010, 2:21 pm

Re: What is payya laying charge?

Post by sam_m400 »

so for only compound foundation work you are giving 80 rs per Sqft ,is that right?. Then compound wall you will paying separtely around 40 Rs which make total cost to 120 Rs. Is that right? . For me he is quoting 40 Rs for foundation work (payya) and 40 Rs for brick wall above the foundation. For me plinth doesn't come as i am talking about compound wall construction only payya(foundaton) with brick wall above it.
Post Reply

Return to “Civil Construction”