water proofing /terrace & balcony

Post Reply
velu
Posts: 59
Joined: September 15th, 2011, 11:53 pm

water proofing /terrace & balcony

Post by velu »

Hi

Which is the best water proofing brand available in the market for small terrace garden & balcony

Thanks
vhari
Posts: 14
Joined: July 10th, 2011, 3:11 am

Re: water proofing /terrace & balcony

Post by vhari »

Fosroc. Use brusbond tgp one coat and on top of it brushbond
User avatar
ardesarchitects
Posts: 1080
Joined: June 20th, 2009, 2:12 pm

Re: water proofing /terrace & balcony

Post by ardesarchitects »

For terrace gardens direct on the slabs need a pressure grout water proofing system along with water drain trays.If its just the pots being placed on terrace any branded brush bond chemicals are good enough.


Regards
Ar.Praveen.N
Ardes Architects and Interior Designers
ardesarchitects@gmail.com
ardesarchitects.com
sam_m400
Posts: 493
Joined: April 6th, 2010, 2:21 pm

Re: water proofing /terrace & balcony

Post by sam_m400 »

Can you please elobrate "what is grout water proofing system along with water drain trays" ?
User avatar
ardesarchitects
Posts: 1080
Joined: June 20th, 2009, 2:12 pm

Re: water proofing /terrace & balcony

Post by ardesarchitects »

Hi,
pressure grout system is used to fill micro gaps in the rcc using pressure pump. The chemical is injected into the rcc and it solidifies over a period of time.
Drain trays are used for growing lawns and small plants . These create a gap between lawn soil and terrace slab allowing excess water to flow.

Regards
Ar.Praveen.N
Ardes architects and interior designers
www.ardesarchitects.com
ardesarchitects@gmail.com
sam_m400
Posts: 493
Joined: April 6th, 2010, 2:21 pm

Re: water proofing /terrace & balcony

Post by sam_m400 »

When should we apply 1. pressure grout system? .either Once roofing is done then during curing of 21/15 days or at any time latter. or during the roof concreting time.

When should branded brush bond to be done . pressure grout system? .either Once roofing is done then during curing of 21/15 days or at any time latter. or during the roof concreting time.