labour contract (plumbing)

maheshvivid2003
Posts: 370
Joined: January 24th, 2012, 11:57 am

Re: labour contract (plumbing)

Post by maheshvivid2003 »

i just got a quote from plumber

rs6500 for each bathroom floor mounting commod n basic fittings
rs 8500 for each bath room n for wall mounting commod n premium fittings
rs5000 for each kitchen and utility

it includes all except earth work for installing pipes and bwssb charges

is this reasonable ?
BengaluruBoy
Posts: 210
Joined: June 18th, 2009, 1:27 pm

Re: labour contract (plumbing)

Post by BengaluruBoy »

I think its reasonable. I got the quote of 8K and 10K respectively for same work for bathrooms and 2K each for kitchen.
maheshvivid2003
Posts: 370
Joined: January 24th, 2012, 11:57 am

Re: labour contract (plumbing)

Post by maheshvivid2003 »

2k to 3k max for each kitchen but this guy is askin 5k for each kitchen n utility n when i asked him he said that water connection to sink and water purifier point n in utility washing machine point n water out point ..

wat work includes in 2k for each kitchen ?
Chetanl
Posts: 24
Joined: December 31st, 2011, 8:29 pm

Re: labour contract (plumbing)

Post by Chetanl »

@Mahesh: Haven't heard from you for long regarding the plumbing. Can you please share the details of the plumber who quoted the above price?
pradeepecr
Posts: 191
Joined: February 14th, 2012, 6:22 pm

Re: labour contract (plumbing)

Post by pradeepecr »

Hi Chetanl,

If u interested, I can give my plumber contact. He is doing at 5k per bathroom for me 5 bathrooms.
For kitchen he is not charging extra, I have one dish wash basin. He is doing good job.
Chetanl
Posts: 24
Joined: December 31st, 2011, 8:29 pm

Re: labour contract (plumbing)

Post by Chetanl »

Hi Pradeep,

I am about to receive the quotation for plumbing work today from a plumber. But last time I spoke to him he was quoting 12k per bathroom(total 4), 10k for kitchen,utility,dining washbasin, 7k for solar water heater connection, 2k per rainwater line, 2k for plumbing work from sump to OHT. He is yet to quote for sanitary line from bathrooms to UGD and construction of chambers. I think this is a bit high.

Can you please pm your plumber's contact?
sam_m400
Posts: 493
Joined: April 6th, 2010, 2:21 pm

Re: labour contract (plumbing)

Post by sam_m400 »

is this includes chambers as well ? in Most of the houses i haven't seen any chambers, just PVC pipe outing the water. Is it really needed?
maheshvivid2003
Posts: 370
Joined: January 24th, 2012, 11:57 am

Re: labour contract (plumbing)

Post by maheshvivid2003 »

@Chetanl

1 plumber quoted the same price that u have mentioned and other was lil less n finally my centering guy gave reference n i saw his work and has done decent work even he quated the market rates and finally after nego he is doing for 55k that includes

7 bathroom ..floor mounting comod with solar point and saperate water lines and geyser point wash basin per bathroom
2 bathroom ..wall mounting comod and single lever diverters geyser solar point and hot n cold water in wash basin
4 kitchens sink hot n cold water n aquaguard point washing machine point n utility
and also water outlet from roof top

rain water lines and water line from sump to oht and chambers all these r included

for water proofing i need to pay the labour which is excluded from the above and also rain water harvesting for which he asked 10k for installing tank and neccessary connections

he has installed water lines still water proofing for bathroom and sanitary lines r pending for this im calling him from the past 1 week he hasnt turned up and postponing the work and already paid 11k as labour and his visitng charges r extra

mostly when any labour contractors plumbing carpentry civil or electrician they will be lil unprofessional when they do work for lesser price and some people give good service when u pay lil higher....more or less work will be same ...
Last edited by maheshvivid2003 on February 18th, 2013, 8:55 pm, edited 4 times in total.
maheshvivid2003
Posts: 370
Joined: January 24th, 2012, 11:57 am

Re: labour contract (plumbing)

Post by maheshvivid2003 »

chamber is must...reason it can be cleaned when the pipes r blocked mostly for sanitary lines for water isnt neccesary i guess
Last edited by maheshvivid2003 on February 18th, 2013, 8:52 pm, edited 1 time in total.
sam_m400
Posts: 493
Joined: April 6th, 2010, 2:21 pm

Re: labour contract (plumbing)

Post by sam_m400 »

total i got a quote of 22 K, not sure worthy = Two bath rooms with concealed commode + Kitchen (Water purifier ,sink) + utility (washing machine inlet/outlet) + one pipe in compound for car washing + 4 chambers + sump motor to OVH , sump motor to sump + rain water harvesting lines + solar pipe inlets to 2 bath rooms and kitchen . I am not sure above his quality of work.