Page 1 of 1

Nobel Residency Plot No 341 and 339 is divided into sub plot

Posted: March 10th, 2016, 1:01 pm
by manjurashmi
Hi All,

In Nobel Residency there are Plot number 341, 339, 328 are further sub divided into sites 341/1, 341/2.. 341/27 and for 328/1, 328/2... 328/12.

So what is the basis for converting these larger sites 341, 339 and 329 into sub sites. In plan document these sub sites are hand written and how do I verify the legality of these sub sites?

Is it possible to get EC on larger site number 341, 339 and 328?