2day steel price perton
prime gold 50k for fe500 grade
indus 54.4k
n all other brands fe415 49.k to 50k
prime gold 50k for fe500 grade
indus 54.4k
n all other brands fe415 49.k to 50k
-
- Posts: 250
- Joined: October 24th, 2010, 6:37 pm
Re: Construction material prices
I have been ussing ACC PPC so far. Over the last three months, I started paying Rs.305, Rs.315, Rs.320.
I have got ACC Concrete Plus for Molding today: Rs.330 per bag. (130 bags).
Trichy Sand: 420 cft: 19000.
I have got ACC Concrete Plus for Molding today: Rs.330 per bag. (130 bags).
Trichy Sand: 420 cft: 19000.
-
- Posts: 370
- Joined: January 24th, 2012, 11:57 am
Re: Construction material prices
2day bought chamundi steel 49.5k per tone including tax
kolegala river sand 25k savari load 6 wheeler lorry
jelly rs20 for 40mm
kolegala river sand 25k savari load 6 wheeler lorry
jelly rs20 for 40mm
-
- Posts: 191
- Joined: February 14th, 2012, 6:22 pm
Re: Construction material prices
Hi mahesh,
River Sand kolegala, How many units or Cft roughly ? Is it a 10 wheeler leyland lorry.? my neighbour site have taken 10 wheeler lorry from hebbal. its good river soil
it cost him 36K.
Regards,
Pradeep
River Sand kolegala, How many units or Cft roughly ? Is it a 10 wheeler leyland lorry.? my neighbour site have taken 10 wheeler lorry from hebbal. its good river soil
it cost him 36K.
Regards,
Pradeep
-
- Posts: 370
- Joined: January 24th, 2012, 11:57 am
Re: Construction material prices
400 to 430 cft it is 6 wheeler lorry ashok leylandpradeepecr wrote:Hi mahesh,
River Sand kolegala, How many units or Cft roughly ? Is it a 10 wheeler leyland lorry.? my neighbour site have taken 10 wheeler lorry from hebbal. its good river soil
it cost him 36K.
Regards,
Pradeep
Re: Construction material prices
6 wheeler lorries carry less than 450 CFT. 1 Unit as sold in TN areas measure approx 100 CFT. 10 wheelers when loaded well measure beyond 550 CFT. 36K for 550 CFT is still a very expensive price. There arealso few who also purchase sand in tonnnage. This is a bad thought process as the vendors fill water to increase the weight of the sand. Strange...but true !!
Re: Construction material prices
What are the realistic prices at present for following items. This is required for signing building contract with contractor.
1. 43/53 grade Brila cement
2. prime gold steel (per ton)
3. River sand (per savari)
4. Burma teakwood (per cft)
5. Honne wood frame & shutter (per cft)
6. Red sal wood frame
7. medium range parry ware (commode, wash basin, SS sink, tap)
8. Niki flush doors (medium type)
9. anchor roma modular switch (medium range)
10. MS gate (per sft)
11. MS staircase railing (per rft)
12. SS 301/304 staircase railing (per rft)
13. 4mm thick modiguard glass (per sft )
14. Table moulded red brick
15. MS balcony railing (per rft)
16. parking area terracotta tiles
17. Sintex 1000l tank
18. RCC sump (per litre)
19. Kitchen granite (40mm)
1. 43/53 grade Brila cement
2. prime gold steel (per ton)
3. River sand (per savari)
4. Burma teakwood (per cft)
5. Honne wood frame & shutter (per cft)
6. Red sal wood frame
7. medium range parry ware (commode, wash basin, SS sink, tap)
8. Niki flush doors (medium type)
9. anchor roma modular switch (medium range)
10. MS gate (per sft)
11. MS staircase railing (per rft)
12. SS 301/304 staircase railing (per rft)
13. 4mm thick modiguard glass (per sft )
14. Table moulded red brick
15. MS balcony railing (per rft)
16. parking area terracotta tiles
17. Sintex 1000l tank
18. RCC sump (per litre)
19. Kitchen granite (40mm)
Re: Construction material prices
Few prices which I brought
1. Birla Super 53 G - Rs 335
2. Prime Gold - Rs50K per ton
3. River Sand - Rs 22 K for 6 wheeler
4. Burma Teak - 3100 to 3300 Per CFT (thickness dependent)
5. Honne - Rs 1775 Per CFT
6. Red Sal - Rs 950 to 1050 (1050 is the best quality among sal as per carpenter and shopkeeper comment)
7. Jelly 20mm - Rs 22per CFT
8. Jelly 40mm- Rs 20perCFT
Mukesh
1. Birla Super 53 G - Rs 335
2. Prime Gold - Rs50K per ton
3. River Sand - Rs 22 K for 6 wheeler
4. Burma Teak - 3100 to 3300 Per CFT (thickness dependent)
5. Honne - Rs 1775 Per CFT
6. Red Sal - Rs 950 to 1050 (1050 is the best quality among sal as per carpenter and shopkeeper comment)
7. Jelly 20mm - Rs 22per CFT
8. Jelly 40mm- Rs 20perCFT
Mukesh
-
- Posts: 210
- Joined: June 18th, 2009, 1:27 pm
Re: Construction material prices
Hi Mumah,
Can you share the contact details for the wood supplier? Are you/carpenter satisfied with the wood quality?
TIA
Can you share the contact details for the wood supplier? Are you/carpenter satisfied with the wood quality?
TIA
Re: Construction material prices
Thank you Mukesh.mumah wrote:Few prices which I brought
1. Birla Super 53 G - Rs 335
2. Prime Gold - Rs50K per ton
3. River Sand - Rs 22 K for 6 wheeler
4. Burma Teak - 3100 to 3300 Per CFT (thickness dependent)
5. Honne - Rs 1775 Per CFT
6. Red Sal - Rs 950 to 1050 (1050 is the best quality among sal as per carpenter and shopkeeper comment)
7. Jelly 20mm - Rs 22per CFT
8. Jelly 40mm- Rs 20perCFT
Mukesh