Labor Contract: Quotation Feedback
Posted: October 3rd, 2022, 11:23 am
I am planning a G=3 on a 60 * 40 plot. Planning to use a Labor Contractor for the same and hve received the following Quotation for the structure
1. 10’X10’= 100sft, Roof to roof
measurement including Centering work
and bar bending work
34,000/-
2. Sump tank work extra per litre 8.00/-
3. Overhead tank extra roof
measurement
0.00/-
4. Compound work extra per square feet `: 70.00/-
5. Drainage Chappadi stone work extra
per Square feet
`: 80.00/-
6. Parapet wall per Square feet : 70.00/-
7. Terrace work Per Square feet : 0.00/-
8. All Material Including scaffolding work
and Material like sarve hagga sponge
is contractor responsibility
`: 0.00/-
9. Drum, Bucket, Every Sunday curing
payment, earth work, soil filling owner
responsibility
10. No major work day curing payment
daily
`: 450.00/-
11. Watch man salary per Month `:
3,500.00/-
Payment schedule as per below:
1. Plinth and column raising and centering advance: `: 1,75,00.00/-
2. Ground Floor Slab : `: 3,00,00.00/-
3. First Floor Slab : `: 3,00,00.00/-
4. Second Floor Slab : `: 3,00,00.00/-
5. Third Floor Slab : `: 2,30,00.00/-
6. Staircase and Lift Room : `: 1,00,00.00/-
7. Ground Floor wall Construction : `: 40,00.00/-
8. First Floor wall Construction : `: 90,00.00/-
9. Second Floor wall Construction : `: 90,00.00/-
10. Third Floor wall Construction : `: 60,00.00/-
11. Lift Floor wall Construction : `: 35,00.00/-
12. Plastering Sarve Advance : `: 40,00.00/-
13. Ground Floor Plastering : `: 30,00.00/-
14. First Floor Plastering : `: 50,00.00/-
15. Second Floor Plastering : `: 50,00.00/-
16. Third Floor Plastering : `: 50,00.00/-
17. Lift Room And Staircase Plastering `: 40,00.00/-
18. Outside East Plastering `: 50,00.00/-
19. Outside West Plastering `: 50,00.00/-
20. Outside North Plastering `: 50,00.00/-
21. Outside South Plastering `: 50,00.00/-
Grand Total: `: 22, 20, 00.00/-
Have a Architect appointed; need some feedback on what else is missing in the contract terms.
Will be highly appreciative if I can get some insights into this process.
Thanks
1. 10’X10’= 100sft, Roof to roof
measurement including Centering work
and bar bending work
34,000/-
2. Sump tank work extra per litre 8.00/-
3. Overhead tank extra roof
measurement
0.00/-
4. Compound work extra per square feet `: 70.00/-
5. Drainage Chappadi stone work extra
per Square feet
`: 80.00/-
6. Parapet wall per Square feet : 70.00/-
7. Terrace work Per Square feet : 0.00/-
8. All Material Including scaffolding work
and Material like sarve hagga sponge
is contractor responsibility
`: 0.00/-
9. Drum, Bucket, Every Sunday curing
payment, earth work, soil filling owner
responsibility
10. No major work day curing payment
daily
`: 450.00/-
11. Watch man salary per Month `:
3,500.00/-
Payment schedule as per below:
1. Plinth and column raising and centering advance: `: 1,75,00.00/-
2. Ground Floor Slab : `: 3,00,00.00/-
3. First Floor Slab : `: 3,00,00.00/-
4. Second Floor Slab : `: 3,00,00.00/-
5. Third Floor Slab : `: 2,30,00.00/-
6. Staircase and Lift Room : `: 1,00,00.00/-
7. Ground Floor wall Construction : `: 40,00.00/-
8. First Floor wall Construction : `: 90,00.00/-
9. Second Floor wall Construction : `: 90,00.00/-
10. Third Floor wall Construction : `: 60,00.00/-
11. Lift Floor wall Construction : `: 35,00.00/-
12. Plastering Sarve Advance : `: 40,00.00/-
13. Ground Floor Plastering : `: 30,00.00/-
14. First Floor Plastering : `: 50,00.00/-
15. Second Floor Plastering : `: 50,00.00/-
16. Third Floor Plastering : `: 50,00.00/-
17. Lift Room And Staircase Plastering `: 40,00.00/-
18. Outside East Plastering `: 50,00.00/-
19. Outside West Plastering `: 50,00.00/-
20. Outside North Plastering `: 50,00.00/-
21. Outside South Plastering `: 50,00.00/-
Grand Total: `: 22, 20, 00.00/-
Have a Architect appointed; need some feedback on what else is missing in the contract terms.
Will be highly appreciative if I can get some insights into this process.
Thanks