ಕನಸಿನ ಮನೆ ಪ್ರಾರಂಭೋತ್ಸವ (Dream house construction started )
Posted: July 4th, 2022, 7:25 am
Hi All,
I am Manohar regular visitor of mybdasites and its been phenomenal experience and the knowledge that I have acquired through this forum all these years. Its all started when I purchased site in 2018 July, I started doing research on house plans, models, materials requirements, construction experience of house owners etc luckily I found this forum and become a member of this group instantly.
Its all most took 4 years for me to start realizing my dream house, yes finally with God's grace I am able to start my project this year. My plot dimension is 30 x 50 east facing and my plan is to construct G + 2, ground floor 2bhk rental unit and remaining space is for parking where 2 cars can be parked parallelly with provision for 5 bikes first and second floor is duplex and third floor is one multipurpose room with open terrace for terrace gardening.
As I have plans for doing RWH and based on my terrace space availability I decided to have sump of at least 25000 litres capacity with 2 portion, one for regular use i.e. bore water provided by layout with 8000 litres and other one is for storing rain water. Thanks for Mr. Sampath (mybdasite member) for helping me to decide the sump capacity.
It was always in mind that I want to be part of my dream project so decided to go with Labour contract and provide the materials on my own. I had a little experience of of Labour contract as 6 years back I did alteration of my house back in my native which almost took 2 months to complete the same.
Luckily I met my family friend who started his project back in 2020 with Labour contract, I was constantly in touch with him and was following up his project. Some times I used to share my knowledge which I have acquired through this forum.
I was really impressed the work of his mestri and architect , so decided to go ahead with this combo for my project as well. As I was very peculiar about my plan with four years of my research it was easy to convey my requirement to the architect. It almost took 7 rounds and 2 months of discussion to finalize the plan of my dream house.
Coming to the mestri , we needed one of round of discussion for price negotiation as my friend was using cement blocks but my choice was red bricks that to size of 9" x 4" x 3". So before having discussion with him I just enquired with one more mestri where he quoted 30k per unit (10 x 10 sqft) including compound wall. Sump, Chain link staircase & complex elevation design extra. Actually it was a good deal to go with him comparing to the current market trend for red bricks construction but I haven't seen his work and moreover on personal front I didn't like his way of communication. With this discussion in mind we started price negotiation with my friend's mestri, he quoted 35k excluding sump, chain link staircase and elevation. We felt the price is too high, I was ready to close the deal for 32k but he was very adamant at 34k. He was telling so many stories and hardship involved in red bricks construction, he was emphasizing much on one point that finding and retaining Labour having skills of red bricks construction in current market is very difficult it seems. Finally he came down to 33k but quoting extra 40k for RCC sump, 3000 Rs/Chain link step and elevation based on design. We still felt the price is too exorbitant especially with chain link steps. In my case at least we are getting 40 steps , so based on his price it would be around 1 lack 20 thousand extra for steps. I knew from the discussion of Rashmi that price of one chain link step is going to be around 1500 Rs, so based on that calculation I decide to finalize it for 35K including everything. Initially he was not accepting asking extra for elevation with 35k deal but finally we made him to agree including everything. I am not sure whether this is a good deal or not w.r.t to current market but have decided to go with him for the quality of his work.
As Labour contract is finalized did Bhoomi pooja on 23rd of June and shifted my house from electronic city to layout. Today going to start shed construction so sourced a 10 wheeler load of M sand for 24k and cement blocks of 34 Rs each. Now need to get 6 bags of cement and a iron door so signing off for the day..
I am Manohar regular visitor of mybdasites and its been phenomenal experience and the knowledge that I have acquired through this forum all these years. Its all started when I purchased site in 2018 July, I started doing research on house plans, models, materials requirements, construction experience of house owners etc luckily I found this forum and become a member of this group instantly.
Its all most took 4 years for me to start realizing my dream house, yes finally with God's grace I am able to start my project this year. My plot dimension is 30 x 50 east facing and my plan is to construct G + 2, ground floor 2bhk rental unit and remaining space is for parking where 2 cars can be parked parallelly with provision for 5 bikes first and second floor is duplex and third floor is one multipurpose room with open terrace for terrace gardening.
As I have plans for doing RWH and based on my terrace space availability I decided to have sump of at least 25000 litres capacity with 2 portion, one for regular use i.e. bore water provided by layout with 8000 litres and other one is for storing rain water. Thanks for Mr. Sampath (mybdasite member) for helping me to decide the sump capacity.
It was always in mind that I want to be part of my dream project so decided to go with Labour contract and provide the materials on my own. I had a little experience of of Labour contract as 6 years back I did alteration of my house back in my native which almost took 2 months to complete the same.
Luckily I met my family friend who started his project back in 2020 with Labour contract, I was constantly in touch with him and was following up his project. Some times I used to share my knowledge which I have acquired through this forum.
I was really impressed the work of his mestri and architect , so decided to go ahead with this combo for my project as well. As I was very peculiar about my plan with four years of my research it was easy to convey my requirement to the architect. It almost took 7 rounds and 2 months of discussion to finalize the plan of my dream house.
Coming to the mestri , we needed one of round of discussion for price negotiation as my friend was using cement blocks but my choice was red bricks that to size of 9" x 4" x 3". So before having discussion with him I just enquired with one more mestri where he quoted 30k per unit (10 x 10 sqft) including compound wall. Sump, Chain link staircase & complex elevation design extra. Actually it was a good deal to go with him comparing to the current market trend for red bricks construction but I haven't seen his work and moreover on personal front I didn't like his way of communication. With this discussion in mind we started price negotiation with my friend's mestri, he quoted 35k excluding sump, chain link staircase and elevation. We felt the price is too high, I was ready to close the deal for 32k but he was very adamant at 34k. He was telling so many stories and hardship involved in red bricks construction, he was emphasizing much on one point that finding and retaining Labour having skills of red bricks construction in current market is very difficult it seems. Finally he came down to 33k but quoting extra 40k for RCC sump, 3000 Rs/Chain link step and elevation based on design. We still felt the price is too exorbitant especially with chain link steps. In my case at least we are getting 40 steps , so based on his price it would be around 1 lack 20 thousand extra for steps. I knew from the discussion of Rashmi that price of one chain link step is going to be around 1500 Rs, so based on that calculation I decide to finalize it for 35K including everything. Initially he was not accepting asking extra for elevation with 35k deal but finally we made him to agree including everything. I am not sure whether this is a good deal or not w.r.t to current market but have decided to go with him for the quality of his work.
As Labour contract is finalized did Bhoomi pooja on 23rd of June and shifted my house from electronic city to layout. Today going to start shed construction so sourced a 10 wheeler load of M sand for 24k and cement blocks of 34 Rs each. Now need to get 6 bags of cement and a iron door so signing off for the day..