Page 1 of 2
Starting Twin House Construction in BDA Layout
Posted: December 30th, 2020, 8:39 am
by riturajmnit
Hello All,
I had immensely benefitted from this forum during my last house construction where we moved in July 2016. Below is thread on same:
http://www.mybdasites.com/viewtopic.php?f=36&t=6827
Now we are planning to make aa bigger space (Twin identical house/Mirror House) on two plots in a BDA approved gated layout.
Plan and design is 99% finalized and I will be posting few renders for your feedback. Each house is approx 3500 sqft. We plan to finalize contractor by Feb Mid so that we can get rolling by Feb end. I am using services of same architect who did our previous house.
Can someone help me with below:
1. Trusted Soil testing Firm
2. BDA approval Pointers
Thanks
Re: Starting Twin House Construction in BDA Layout
Posted: January 2nd, 2021, 3:09 pm
by ganeshncm
Approval i think is BBMP and not BDA. That is the most demotivating and painful part of the construction. You need to get hold of a middleman.
Re: Starting Twin House Construction in BDA Layout
Posted: March 14th, 2021, 6:30 am
by riturajmnit
Hello All,
So we are almost hitting the ground now. Contractor is finalised and work should commence in 10 days. Schedule timeline for Structural finish is Nov mid.
What is typical mobilisation amount for full contract ? He is asking for 15% which looks tad more to me.
Also attaching elevation which will go some churn at least on appearance as we move.
Re: Starting Twin House Construction in BDA Layout
Posted: April 10th, 2021, 6:30 pm
by sunil18vns
This guy did bda approval vinay 098456 04455
Re: Starting Twin House Construction in BDA Layout
Posted: June 5th, 2021, 6:41 pm
by ashokkumarhj
Yes usually contractor takes that as mobilisation money
and it also depends when is your next payment
Re: Starting Twin House Construction in BDA Layout
Posted: September 20th, 2021, 4:23 pm
by riturajmnit
We were able to start our construction on August 7 and currently footing is done and work is onset to plinth. We are using RMC (Ultratech) for all concrete work.
Can anyone suggest whats the typical cost for temporary connection and how this prepaid meter thing works ? We have been quoted 21000 for connection (with 8500 prepaid deposit). How much is typical bill for 2KW and how much the contractor charges commission for bill ?
Re: Starting Twin House Construction in BDA Layout
Posted: September 20th, 2021, 6:25 pm
by RashmiL
We had paid 19k for 2kv temporary connection which comes with 8500 rs current.
Re: Starting Twin House Construction in BDA Layout
Posted: September 20th, 2021, 6:29 pm
by RashmiL
Btw why 15%. What are all covered in 15%?. It's very high amount. Firstly for a building of 4 floors (3800 sq ft, ) bare building will cost only 30 lakhs. Assuming the cost of building is 1 crore it will come to 30%. So entire bare building structure will cost you 30% which is after several months. Contractors are easily able to ride on gullible customers.
Ask him why 15%. What if you don't get well with his work ? Your money is gone. So don't go above 5%. In fact I check with friends on work stages and payments before writing cheque.
Re: Starting Twin House Construction in BDA Layout
Posted: September 20th, 2021, 6:53 pm
by riturajmnit
RashmiL wrote: ↑September 20th, 2021, 6:25 pm
We had paid 19k for 2kv temporary connection which comes with 8500 rs current.
Thank you, how much he charges for paying bill and I am not sure if he works in sarjapur road area, if he does possible to share number
Re: Starting Twin House Construction in BDA Layout
Posted: December 2nd, 2021, 10:36 am
by riturajmnit
So we have snailed upto PCC completion on ground floor.
Can folks advise on Concrete Block vendors in Sarjapur road. Ours is column bearing structure, so dont see logic of spending too much with APCO and equivalent,
Any other good vendors ? We are considering AVS
Thanks