Material + Labour Contract - Advise required
Posted: November 27th, 2020, 2:50 pm
Hi,
I have a house in Banashankari 3rd Stage which is spread only on Ground Floor. Now, am planning to construct a duplex house (1st and 2nd Floor) on top and am discussing it with my friend who is a builder.
He has given a quotation of Rs 38 lakhs calculated at Rs 1.75 lakhs per Chadra. Total construction area is 22 chadras (2200 Sq Ft)
Please advice if the quotation is fair and worth it.
He will be doing all the work from construction to interiors. Below are the list of work he will be undertaking and materials he will use.
1st Floor: Hall, Dining, Pooja Room, Modular Kitchen, Common Toilet, Bedroom and Utility
2nd Floor: 2 Bedrooms + attach bathrooms, 1 study room, Hall and utility (Teflon Glass)
1. Steel : kamadhenu Steel (16mm, 12mm, 10mm & 8mm)
2. Cement : Penna
3. Concrete Solid Blocks : Hollow Block Bricks (04 and 06)
4. Main Door and Pooja room : Teakwood
5. All windows and Vascal : Red Soil Wood
6. Room Door : Designed Plus Door
7. Bathroom Doors : Designed PVC Door
8. Painting : Asian Paints
9. CPVC Pipes : Ashirvad Pipes
10. PVC Pipes : Supreme Pipes
11. Kitchen and Bathroom : Jaguar
12. Wall mount commode : Cera
13. 1 Tank of 1000 liters : Kaveri
14. Staircase Railings : SS Railings
15. Flooring : Vitrified Tiles of 2x4
16. Staircase : Granite
17. Kitchen Slab : Granite
18. Bathroom Tiles : Ceramic
19. Wooden and aluminium Composite Panel Interior : Century Plywood
20. Electric Wire and Switches : Anchor
21. Main Door Fittings : Europa
22. Windows and Doors Fittings : A1 SS
23. All rooms will be fitted with fans
24. Modern TV unit with LED lighting and false ceiling for main hall
25. Parking antiskid tiles
26. Front elevation and Gate
27. Geyser for bathroom
Almost A to Z will be done by him.
Following are the things that are not included
1. Solar
2. Water and Current Bill during construction
3. Water and Current Meter to be re-installed after construction
Kindly let me know if all this is worth Rs 38 lakhs? Should I negotiate anywhere?
Also, how much Current and water charges will I incur? He has given a time frame of 6 to 7 months for construction.
I have a house in Banashankari 3rd Stage which is spread only on Ground Floor. Now, am planning to construct a duplex house (1st and 2nd Floor) on top and am discussing it with my friend who is a builder.
He has given a quotation of Rs 38 lakhs calculated at Rs 1.75 lakhs per Chadra. Total construction area is 22 chadras (2200 Sq Ft)
Please advice if the quotation is fair and worth it.
He will be doing all the work from construction to interiors. Below are the list of work he will be undertaking and materials he will use.
1st Floor: Hall, Dining, Pooja Room, Modular Kitchen, Common Toilet, Bedroom and Utility
2nd Floor: 2 Bedrooms + attach bathrooms, 1 study room, Hall and utility (Teflon Glass)
1. Steel : kamadhenu Steel (16mm, 12mm, 10mm & 8mm)
2. Cement : Penna
3. Concrete Solid Blocks : Hollow Block Bricks (04 and 06)
4. Main Door and Pooja room : Teakwood
5. All windows and Vascal : Red Soil Wood
6. Room Door : Designed Plus Door
7. Bathroom Doors : Designed PVC Door
8. Painting : Asian Paints
9. CPVC Pipes : Ashirvad Pipes
10. PVC Pipes : Supreme Pipes
11. Kitchen and Bathroom : Jaguar
12. Wall mount commode : Cera
13. 1 Tank of 1000 liters : Kaveri
14. Staircase Railings : SS Railings
15. Flooring : Vitrified Tiles of 2x4
16. Staircase : Granite
17. Kitchen Slab : Granite
18. Bathroom Tiles : Ceramic
19. Wooden and aluminium Composite Panel Interior : Century Plywood
20. Electric Wire and Switches : Anchor
21. Main Door Fittings : Europa
22. Windows and Doors Fittings : A1 SS
23. All rooms will be fitted with fans
24. Modern TV unit with LED lighting and false ceiling for main hall
25. Parking antiskid tiles
26. Front elevation and Gate
27. Geyser for bathroom
Almost A to Z will be done by him.
Following are the things that are not included
1. Solar
2. Water and Current Bill during construction
3. Water and Current Meter to be re-installed after construction
Kindly let me know if all this is worth Rs 38 lakhs? Should I negotiate anywhere?
Also, how much Current and water charges will I incur? He has given a time frame of 6 to 7 months for construction.