My house which is under elevation construction stage all three sides external plastering is done except front side where in elevation work is going on . Now the some portion of wall where elevation isrequired the mestri has drilled 3 inch deep holes in wall and 12 mm in dia 9 inch in length steel rods and then he has used steel rods and steel mesh to get projected shape , now he has not plastered the wall for projected area , Now I suspect that the rain water might seep in between wall and project area and walls will be wet , Mestri says water will not seep in between wall and projected area
Need a suggestion /recomendation here .
regards
Nitin
Need a suggestion /recomendation here .
regards
Nitin