urgent feedback required pls
Posted: March 4th, 2015, 1:56 am
hello sir,
we are also constructing our house, we have finished the plinth level and soil filling and the concrete laying is done hes starting the pillar to reach lintel level, but our contractor is doing the pillar concrete filling work manually (in the sense hes not using centering guys and gang machine) hes just starting with 4 pillars and then move to the others (remaining 8 as we have 12 pillars)
i wanted to know if the work for pillars is done together by centering guys and concrete filling thru gang machine? or manually like how our contractor is doing!
pls give feedback ASAP, thanks
WBR
elhani.
we are also constructing our house, we have finished the plinth level and soil filling and the concrete laying is done hes starting the pillar to reach lintel level, but our contractor is doing the pillar concrete filling work manually (in the sense hes not using centering guys and gang machine) hes just starting with 4 pillars and then move to the others (remaining 8 as we have 12 pillars)
i wanted to know if the work for pillars is done together by centering guys and concrete filling thru gang machine? or manually like how our contractor is doing!
pls give feedback ASAP, thanks
WBR
elhani.