Preparations before Roof Mould
Posted: January 5th, 2015, 11:22 am
Hi All,
In a week's time, the first roof is going to get casted for my house. Is there any thing that needs to be planned wrt what needs to be connected from the roof.
The points I have considered are
1. Electrical ducts which can run through the roof to minimize the grooving in the wall. this would save on labour
2. Hooks for chandalier, fans, ullale (swing)
3. Lighting points for atta
Is there anything else that needs to be considered before hand ?