SSM required for front gating area

Posted: August 1st, 2014, 5:57 am
by tendlu
Is SSM foundation required in the entrance parking gate area? I am asking this because SSM is typically used in the compound wall area but not sure whether it is required for the front gate entrance area. In other words, can I do the front gate area without SSM?

Re: SSM required for front gating area

Posted: August 1st, 2014, 4:02 pm
by mcneha
Hi!

Doing SSM below the gate, purely depends on the level difference between the road in front of the gate and the area just inside the gate. If more filling is there then SSM is required or else, BBM is enough.

Regards.

CHANDRASEKAR
xxxxxxxxxxxxxxxxxxx

Re: SSM required for front gating area

Posted: August 7th, 2014, 12:10 pm
by tendlu
thanks chandrasekar!

the height difference between road in front if gate and just inside the gate is 1.5ft. is SSM required in this case?

Re: SSM required for front gating area

Posted: August 7th, 2014, 4:04 pm
by mcneha
Hi tendlu!

Since it is almost the last stage of work, you can do it either with left over bricks or with left over size stones. Take care for the placement of drain covering in front of the gate.

Regards.
CHANDRASEKAR

Re: SSM required for front gating area

Posted: August 8th, 2014, 2:19 pm
by mcneha
Hi tendlu!

SSM or BBM is fine, provided you are taking care for the drain slab support.