Hi all
Iam about to start construction. I wanted to know approx cement consumption (no. of bags of required) and sand consumption (no.of loads/cft required) for a 30 chaddara house ( G+2 floors). This is required in order to do rough estimation of the budget for the construction materials.
Any thumb rule is also fine for me.
Iam about to start construction. I wanted to know approx cement consumption (no. of bags of required) and sand consumption (no.of loads/cft required) for a 30 chaddara house ( G+2 floors). This is required in order to do rough estimation of the budget for the construction materials.