What is the market rate for per litre cost for sump. My contractor has quoted Rs. 10 per litre.
Regards
Prasanna Bhat
Sump Cost
-
- Posts: 23
- Joined: May 28th, 2012, 12:28 pm
-
- Posts: 134
- Joined: May 27th, 2013, 8:57 pm
Re: Sump Cost
hi sir please ask him what all items are included as per his quote rs 10/liter
-
- Posts: 23
- Joined: May 28th, 2012, 12:28 pm
Re: Sump Cost
Its a sump built with bricks and cement plastering is done on it.
Re: Sump Cost
Hello,
My builders quotation for sump is Rs 8/ lt if it is bricks with leak proof plastering and Rs 14/lt for RCC , with MS covering for access.Choice is with me as per agreement. hope this helps
My builders quotation for sump is Rs 8/ lt if it is bricks with leak proof plastering and Rs 14/lt for RCC , with MS covering for access.Choice is with me as per agreement. hope this helps
KVS Setty
Re: Sump Cost
This specification of sump, my contractor charged me at Rs 10/Ltr -
• BRICK WORK SUMP of approximately 10,000 Ltrs with “U” type 8 MM rod at every 6”, with Mesh, and 2 quotes of water proof plastering on all 4 sides and bottom with high quality checkered sump door.
He also said that it will be equivalent to RCC sump, if built in this way. Also, he says this is not ideal if sump is touching any of the neighbors walls/compound etc. Ideal in case of sump being right below garage space etc etc...
• BRICK WORK SUMP of approximately 10,000 Ltrs with “U” type 8 MM rod at every 6”, with Mesh, and 2 quotes of water proof plastering on all 4 sides and bottom with high quality checkered sump door.
He also said that it will be equivalent to RCC sump, if built in this way. Also, he says this is not ideal if sump is touching any of the neighbors walls/compound etc. Ideal in case of sump being right below garage space etc etc...
-
- Posts: 38
- Joined: May 7th, 2012, 12:19 pm
Re: Sump Cost
We did the sump ourselves. For a 6000 litre full RCC sump, it definitely costed more than 70k.
Some high-level breakup:
Labor:
1. Earthwork - 12k
2. Centring - 10k
3. Bar bending - 8k
4. Mason - 10k
Material:
1. Cement - 15 bags 53 grade
2. Sand, jelly - cost is almost same as that of cement
3. Steel - around 250 kg
Some high-level breakup:
Labor:
1. Earthwork - 12k
2. Centring - 10k
3. Bar bending - 8k
4. Mason - 10k
Material:
1. Cement - 15 bags 53 grade
2. Sand, jelly - cost is almost same as that of cement
3. Steel - around 250 kg