"Building line" vs setback
Posted: January 5th, 2013, 5:36 pm
Can someone help me understand the difference between a "building line" (as mentioned in Appendix 1 of the BBMP Master Plan doc) and setback ?
The way I understood them (in curde, layman terms) both was the 'gap to be left' in front of the road (or sides). The only thing I could think of is
that "building line" is applicable only in the road-facing direction, is that all ?
Thanks in advance.
The way I understood them (in curde, layman terms) both was the 'gap to be left' in front of the road (or sides). The only thing I could think of is
that "building line" is applicable only in the road-facing direction, is that all ?
Thanks in advance.