Duped by my contractor. Need opinion to file compensation
Posted: August 23rd, 2012, 1:42 pm
Hi Everyone,
I had constructed a duplex house (Ground Floor and First Floor) with a built-up area of 1796 sqft.
My so called Engineer had provided me a quotation of payment schedule and basic cost of materials in it.
He quoted 1300/sqft w/ vitrified tiles.
He has charged Portico 75% i.e., 115 sft of 153 sft = 1,49,000/- (Usually contractors charge only 50%) Compund Wall 750 rft for 77 rft
1) But after construction the real built up area for Portico and is 70 sft and Compound wall 57 rft. I am getting a difference of close to one lakh.
2) He had quoted white teak for window shutters, but he has provided mixture of honne and red saal for window shutters.
3) He has quoted 3 lacs for flooring. Since I took up the flooring part, everything was provided me including laying, materials, acid wash, etc. I told him to deduct the 3 lacs since I had done that. He states not to go by quotation, that is all business tactics and I have to pay him for flooring part.
When the final evaluation of my built up area was done. I calculated the overall builtup area. I am getting less than what has been quoted in the quotation.
I have already paid him 95% of the amount. After calculation he has to owe me one lakh rupees back to me.
He has taken all my door keys. When I asked him for the amount. He states mistakes do happen and he cannot refund and is asking him to settle the balance amount.
Can I file for a compensation and sue this contractor. If so what is the procedure. and what does the law say?
Please help!!
Thanks,
Manjunath
I had constructed a duplex house (Ground Floor and First Floor) with a built-up area of 1796 sqft.
My so called Engineer had provided me a quotation of payment schedule and basic cost of materials in it.
He quoted 1300/sqft w/ vitrified tiles.
He has charged Portico 75% i.e., 115 sft of 153 sft = 1,49,000/- (Usually contractors charge only 50%) Compund Wall 750 rft for 77 rft
1) But after construction the real built up area for Portico and is 70 sft and Compound wall 57 rft. I am getting a difference of close to one lakh.
2) He had quoted white teak for window shutters, but he has provided mixture of honne and red saal for window shutters.
3) He has quoted 3 lacs for flooring. Since I took up the flooring part, everything was provided me including laying, materials, acid wash, etc. I told him to deduct the 3 lacs since I had done that. He states not to go by quotation, that is all business tactics and I have to pay him for flooring part.
When the final evaluation of my built up area was done. I calculated the overall builtup area. I am getting less than what has been quoted in the quotation.
I have already paid him 95% of the amount. After calculation he has to owe me one lakh rupees back to me.
He has taken all my door keys. When I asked him for the amount. He states mistakes do happen and he cannot refund and is asking him to settle the balance amount.
Can I file for a compensation and sue this contractor. If so what is the procedure. and what does the law say?
Please help!!
Thanks,
Manjunath