My contractor saying the following rate
digging - 6 Rs
foundation stone work - 40 Rs per Sq ft (depth)*total length)
compound wall - 40 rs Per Sq ft (height*total length).
Is this rate prevailing/good one?
Regards
Sam
Re: Foundation cost/compound wall
Posted: August 28th, 2012, 9:29 am
by JollyRogers
Get a JCB to get the earthwork done. You can get them for about Rs.750 per hour. (They need atleast 4 hours of work usually).
This works out half the cost of Rs.6 per sq.ft if done manually.
Re: Foundation cost/compound wall
Posted: August 28th, 2012, 1:32 pm
by maheshvivid2003
i had a bad exp with jcb .....u wont get the exact shape sometimes the mesurement size of the footin will increase ....then the material cost will also increase
only thing is u can save lil money n time thats all
Re: Foundation cost/compound wall
Posted: August 28th, 2012, 2:33 pm
by sam_m400
Thanks, I also heard the same thing from many other sources as well.
Re: Foundation cost/compound wall
Posted: August 28th, 2012, 8:15 pm
by maheshvivid2003
i spent 97 bags of cement for 12 footing bed size 5*6 n 6*7....can anybody share how much cement they used for 12 footing ....
Re: Foundation cost/compound wall
Posted: August 29th, 2012, 4:42 pm
by jult
WHAT IS THE HEIGHT OF THE FOOTING LAID
Re: Foundation cost/compound wall
Posted: August 30th, 2012, 10:57 am
by JollyRogers
I got my site excavation done by JCB. No complaints whatsoever. It all depends on the experience of the person who is operating this.
The entire excavation for 14 pillars and water sump on a 60x40 plot took about 4 hours. Also I hired a guy to do the finishing for the excavation pits. He took 2 days and I think I paid him around 700-800 bucks. Overall I saved over 50% on the cost and the job done in 2 days.
Re: Foundation cost/compound wall
Posted: August 30th, 2012, 1:15 pm
by maheshvivid2003
2 feet height.. footing pit size is 6*6 , 7.6*6 n 5*6 as per plan ....my site 30*40 has loose soil
i gave complete earth work for rs 7 per cft .the excators brought jcb did initial digging n finishing touch is done by 3 people
@ JollyRogers how much cement u used for 14 footing bed ?
Re: Foundation cost/compound wall
Posted: August 30th, 2012, 9:09 pm
by keerthi.blr
@mahesh, you will feel better when u know that 8 pillars consumed 90 bags for footing alone.(Excluding pedestal in 30x 40 site)
Re: Foundation cost/compound wall
Posted: August 30th, 2012, 9:34 pm
by maheshvivid2003
thanks for info keerthi ....