Foundation cost
Posted: July 19th, 2012, 8:28 pm
Hi All
I need to put 2 coarse of foundation to be built below the plinth beam, and masonary is asking this work as extra though 170 Rs per sq:for for internal roof to roof is negotiated.
1. My question does the earthing/foundation (2 coarse ) are normally part of contract. Share your experience?
2. If not included how much it cost as he is charging 5000 Rupees (as my builtup area is 33*35 = 1025) per one side. Means 1025 four side it would cost 20000 Rupess and this includes earthing/foundation building. Is this correct rate?
when i calculated it was very high ,as 5000/(35 * 1.5 * 1) = 95 Rupees which is coming very high. Please do let me know what i am doing it right?
Regards
Sam
I need to put 2 coarse of foundation to be built below the plinth beam, and masonary is asking this work as extra though 170 Rs per sq:for for internal roof to roof is negotiated.
1. My question does the earthing/foundation (2 coarse ) are normally part of contract. Share your experience?
2. If not included how much it cost as he is charging 5000 Rupees (as my builtup area is 33*35 = 1025) per one side. Means 1025 four side it would cost 20000 Rupess and this includes earthing/foundation building. Is this correct rate?
when i calculated it was very high ,as 5000/(35 * 1.5 * 1) = 95 Rupees which is coming very high. Please do let me know what i am doing it right?
Regards
Sam