Page 1 of 1

What is centering charge per Sq.ft or bulk rate?

Posted: July 11th, 2012, 12:30 pm
by sam_m400
Hi

plesae any body recently done do share what is centering charge per Sq.ft or bulk rate with material rent for boxes/labour?.

Regards
Sam

Re: What is centering charge per Sq.ft or bulk rate?

Posted: July 12th, 2012, 10:55 am
by maheshvivid2003
we paid rs 19 per sqft for centring work

Re: What is centering charge per Sq.ft or bulk rate?

Posted: July 12th, 2012, 11:04 am
by Chetanl
@maheshvivid2003: is beam included in the measurement? Is it pipe or wood centering?

Re: What is centering charge per Sq.ft or bulk rate?

Posted: July 12th, 2012, 11:47 am
by sam_m400
Hi

Thanks to add to other two question 1. is beam included in the measurement?
2. Is it pipe or wood centering?
3.is it labour+material ?
4. How many days curing after they dismantled ,as i heard 15 days but i normally we should allow till 21 days for curing before removing
5. Does it include foundation belt/chejja/lintel etc as well ? ie all of the concrete work (roof/beam/pillar/chejja/lintel/belt) is included?

Regards
Sam

Re: What is centering charge per Sq.ft or bulk rate?

Posted: July 13th, 2012, 10:35 am
by maheshvivid2003
metal sheets with wood supporting genrally used for centering
rs 19 labour + material is included
recently gave for plinth beam foundation belt with in a day they dismantle evrything and for roof 15 days it depends on evry individual ...15 days or more is enough is wat contractor say and again it depends

generally for centering work it might be foundation belt/chejja/lintel etc as well ? ie all of the concrete work (roof/beam/pillar/chejja/lintel/belt) and also stair case ...they charge rs 19 to 20 includes labour and material thats wat my contractor said