Page 1 of 1

Labour contract

Posted: June 25th, 2012, 4:12 pm
by sam_m400
Hi

I am looking for labour contact and it got the quote from 200 to 230, and they do calculate based on measurement from pillar to pillar .

What are aspects need to be looked upon so that we won;t get cheated?

Please share your experience

Regards
Sam

Re: Labour contract

Posted: June 25th, 2012, 7:50 pm
by mumah
Generally they measure the roop level + front portion till boundary wall.

Re: Labour contract

Posted: June 26th, 2012, 9:57 am
by m3_07
This is what I have done:

1. construction of fully built up Area - Rate 1
2. Construction of balconies - Rate 2
3. Construction of parking area - Rate 3

This will help you save costs. 20K is slightly on the higher side, but again depends on what it EXCLUDES !!

Re: Labour contract

Posted: June 26th, 2012, 11:36 am
by sam_m400
He told in included everything inside the pillar to pillar, including stair case inside.

Can you please give the rate you received for

1. construction of fully built up Area - Rate 1
2. Construction of balconies - Rate 2
3. Construction of parking area - Rate 3

Sump and compound wall/exterior/excavation separate

Re: Labour contract

Posted: June 26th, 2012, 2:39 pm
by m3_07
1. construction of fully built up Area - Rate 1 @ 17K
2. Construction of balconies - Rate 2 @ 8.5K
3. Construction of parking area - Rate 3 @ 8.5K

Staircase @ 300/ Step
RCC Column box - Extra
Gangman charges - Extra
Sump - 2.5/ Litre
Excavation - 7/ CFT
Parapet/ compound wall - Included in Rate1.

Re: Labour contract

Posted: June 27th, 2012, 1:44 pm
by sam_m400
Can you please share the contractor details as i have asked 2 to 3 people but all are saying 200 Rs, but exterior is separate feeling it is too expensive?

does this include excavation for foundation for interior and exterior walls?

Re: Labour contract

Posted: June 27th, 2012, 4:28 pm
by sam_m400
Can you please share the contractor details as i have asked 2 to 3 people but all are saying 200 Rs, but exterior is separate feeling it is too expensive?

does this include excavation for foundation for interior and exterior walls?

What is this Gangman charges?

RCC Column/Pillar box/Ceiling wood box works for concreting will come anyway as part of centering which should be part of your built up area am i right? . But you have gone that as separate?