Labour charge for construction
Posted: April 19th, 2012, 1:19 pm
Hi
One of my contractor is charging 230 rupees per Sqft Roof measurement covering . Means all internal work inside the roof
RCC work for column beams, slab stairs, lintel ect, RMC mix.
Brick work/solid work for walls as per drawing.
Internal Plastering with lime finish, external with sponge finish
Bar bending work as per design
Curing as per site engineer instructions.
Scaffolding work for external plastering scaffolding material
Door/window framed fixing
Sajja normal , Lintel full or half of the house (specific to house)
outside staircase
flooring and tiling works (As coming under the roof so he considering this as well)
Waterproofing works for toilets, terrace etc. (As coming under the roof so he is considering this as well)
Does not include and are charged separately:
Earth work for compound wall, Compound wall foundation/plastering/brick construction
Sump tanks, over head tank, compound wall .
Compound wall with earth work he is charging 80 Rs per Sqft
Exterior floor plastering - 8 Rs per Sqft
Please give your views on this.
Regards
Sam
One of my contractor is charging 230 rupees per Sqft Roof measurement covering . Means all internal work inside the roof
RCC work for column beams, slab stairs, lintel ect, RMC mix.
Brick work/solid work for walls as per drawing.
Internal Plastering with lime finish, external with sponge finish
Bar bending work as per design
Curing as per site engineer instructions.
Scaffolding work for external plastering scaffolding material
Door/window framed fixing
Sajja normal , Lintel full or half of the house (specific to house)
outside staircase
flooring and tiling works (As coming under the roof so he considering this as well)
Waterproofing works for toilets, terrace etc. (As coming under the roof so he is considering this as well)
Does not include and are charged separately:
Earth work for compound wall, Compound wall foundation/plastering/brick construction
Sump tanks, over head tank, compound wall .
Compound wall with earth work he is charging 80 Rs per Sqft
Exterior floor plastering - 8 Rs per Sqft
Please give your views on this.
Regards
Sam