Is it mandatory to take approval for 2nd floor from BWSSB ?
Posted: July 11th, 2011, 4:41 pm
Dear Sir,
I am building a independent house on 2nd floor (800 sft) on existing houses on gnd floor & Ist floor on 30'x40' plot in H S R Layout.
1.Is it required to get approval from BWSSB for using the same water connection taken for gnd floor house. If so, what is the procedure to get the same ?
Is the application form available on net to download ?
2.Is it mandatory to install RWH(Rain water harvesting ) for this 2nd floor house ?
Please calrify.
Thanks
from
manju ks
I am building a independent house on 2nd floor (800 sft) on existing houses on gnd floor & Ist floor on 30'x40' plot in H S R Layout.
1.Is it required to get approval from BWSSB for using the same water connection taken for gnd floor house. If so, what is the procedure to get the same ?
Is the application form available on net to download ?
2.Is it mandatory to install RWH(Rain water harvesting ) for this 2nd floor house ?
Please calrify.
Thanks
from
manju ks