Finally Started my construction a Duplex 30X50 site in EC...
Re: Finally Started my construction a Duplex 30X50 site in E
Hi,
Wondering the scarcity of Water, You are at the Initial stage of the Construction.
If you are facing the issue of water how will you manage the whole Construction.
Is your site is not with Borewell, what are the alternatives you are considering.
Wondering the scarcity of Water, You are at the Initial stage of the Construction.
If you are facing the issue of water how will you manage the whole Construction.
Is your site is not with Borewell, what are the alternatives you are considering.
Re: Finally Started my construction a Duplex 30X50 site in E
Hi,
My site is in a gate community they don't allow individual bore well to be digged. The association supplies water from 8Am to 12 PM daily.
The problem is that when filling the soil back to the footing area it needs a lot of water. First you fill the soil then pour water and mason used logs to press the soil in. Then again fill soil then pour water. Then allow it to settle. If this is not done while the foundation is being constructed the soil may shrink in.
The water that’s provided by association doesn’t suffice and also i am not comfortable using that.. hence I had asked the tanker guys to get water which is no portable.
However for regular construction activities the water will suffice as now i have the sump ready.
My site is in a gate community they don't allow individual bore well to be digged. The association supplies water from 8Am to 12 PM daily.
The problem is that when filling the soil back to the footing area it needs a lot of water. First you fill the soil then pour water and mason used logs to press the soil in. Then again fill soil then pour water. Then allow it to settle. If this is not done while the foundation is being constructed the soil may shrink in.
The water that’s provided by association doesn’t suffice and also i am not comfortable using that.. hence I had asked the tanker guys to get water which is no portable.
However for regular construction activities the water will suffice as now i have the sump ready.
Regards,
Martin
Martin
-
- Posts: 220
- Joined: September 7th, 2009, 1:53 pm
Re: Finally Started my construction a Duplex 30X50 site in E
m_d1982,
how has been your experience with contractor so far. Is he prompt ?
What is the name of the layout and ongoing price?
Regards
Amit
how has been your experience with contractor so far. Is he prompt ?
What is the name of the layout and ongoing price?
Regards
Amit
Re: Finally Started my construction a Duplex 30X50 site in E
The contractor has been pretty good so far, He is ready to take feedback and make changes are requested. He ensures that he calls me when material arrives so i can have a quick look and kind of certifiy before they are used. No issues with labour he has enough of them who are pressed into work as required.
However these are very early days in construction i guess most of the contractors will be good early on, With time passing and more pressure we need to see whether they are able to sustain it.
My plot is in a place called Ananthnagar Phase 3 (Vasundhara Layout) its close to Huskur Gate. It comes under Anekal Panchayat and is BMRDA approved. I bought it early this year, Prices was 2850/Sq Ft after hard negotiation. I guess currently there won't be much changes in the price.
However these are very early days in construction i guess most of the contractors will be good early on, With time passing and more pressure we need to see whether they are able to sustain it.
My plot is in a place called Ananthnagar Phase 3 (Vasundhara Layout) its close to Huskur Gate. It comes under Anekal Panchayat and is BMRDA approved. I bought it early this year, Prices was 2850/Sq Ft after hard negotiation. I guess currently there won't be much changes in the price.
Regards,
Martin
Martin
Re: Finally Started my construction a Duplex 30X50 site in E
Started the foundation work yesterday.. Natural curing is happening with the light drizzle in Bangalore
The Plinth beam is to be layed on Fri/Sat, Hope it dosen't rain very heavily at that time...
The Plinth beam is to be layed on Fri/Sat, Hope it dosen't rain very heavily at that time...
- Attachments
-
- Foundation Work in progress.
- 20140409_182305.jpg (374.94 KiB) Viewed 7626 times
Regards,
Martin
Martin
Re: Finally Started my construction a Duplex 30X50 site in E
Hi m_d1982,
Is this the plot where you are building?
http://wikimapia.org/#lang=en&lat=12.83 ... 5670/House
Sorry for spying
Is this the plot where you are building?
http://wikimapia.org/#lang=en&lat=12.83 ... 5670/House
Sorry for spying
Re: Finally Started my construction a Duplex 30X50 site in E
Yes thats' right.
No issues with the spying .. I did checkout a few under contruction properties before i started my own construction. But definitely not through Wikimapia
Anyways if someone wants to come down and have look your most welcomed.
No issues with the spying .. I did checkout a few under contruction properties before i started my own construction. But definitely not through Wikimapia
Anyways if someone wants to come down and have look your most welcomed.
Regards,
Martin
Martin
Re: Finally Started my construction a Duplex 30X50 site in E
m_d1982 i am construction close by in hennagara gate.are you building by material or labour contract ? and whats the price ?
Re: Finally Started my construction a Duplex 30X50 site in E
no issues got it fro your earlier post
Re: Finally Started my construction a Duplex 30X50 site in E
Centering work completed. Plinth beam to be layed tommorow.
- Attachments
-
- Centering work 1
- 20140411_182414.jpg (412.54 KiB) Viewed 7513 times
-
- Centering work 2
- 20140411_182347.jpg (383.03 KiB) Viewed 7513 times
Regards,
Martin
Martin