Finally Started my construction a Duplex 30X50 site in EC...

m_d1982
Posts: 137
Joined: January 13th, 2012, 2:10 pm

Re: Finally Started my construction a Duplex 30X50 site in E

Post by m_d1982 »

Centering Work in progress.. Pending work before moulding is column and electrical.
Attachments
Pic 3
Pic 3
20140527_181418.jpg (228.16 KiB) Viewed 7001 times
Pic 2
Pic 2
20140524_185220.jpg (286.59 KiB) Viewed 7001 times
Pic 1
Pic 1
20140527_181439.jpg (234.48 KiB) Viewed 7001 times
Regards,
Martin
m_d1982
Posts: 137
Joined: January 13th, 2012, 2:10 pm

Re: Finally Started my construction a Duplex 30X50 site in E

Post by m_d1982 »

Ready for moulding. Steel work and electrical work completed

150 bags cement, 2.2 Tonnes steel, 2 load 20 MM jelly, 2 loads for Trichy sand
Attachments
Electrical
Electrical
Electrical 1.jpg (359.02 KiB) Viewed 6946 times
Pic 2
Pic 2
Preparation 2.jpg (452.89 KiB) Viewed 6946 times
Pic 1
Pic 1
Preparation 1.jpg (384.83 KiB) Viewed 6946 times
Regards,
Martin
krishnakumar
Posts: 83
Joined: April 25th, 2011, 4:11 pm

Re: Finally Started my construction a Duplex 30X50 site in E

Post by krishnakumar »

Any idea about the cost incurred or paid to get to this level? Was just wondering how much it costs at different phases
balajics
Posts: 13
Joined: April 10th, 2014, 10:26 am

Re: Finally Started my construction a Duplex 30X50 site in E

Post by balajics »

Hi Martin,

Are you not using the mats below the metal sheets ?

regards, Balaji
mcneha
Posts: 34
Joined: July 15th, 2013, 10:52 am

Re: Finally Started my construction a Duplex 30X50 site in E

Post by mcneha »

Dear Mr.Martin

I am not seeing any tension rods in the images you have posted. Between two cranked rods, there should be plain rods almost to the same length of cranks and at same level. Your engineer or contractor will generally not miss this important rods, but the barbenders miss them. Please take care.

Regards.
CHANDRASEKAR
m_d1982
Posts: 137
Joined: January 13th, 2012, 2:10 pm

Re: Finally Started my construction a Duplex 30X50 site in E

Post by m_d1982 »

@ Chandrashekar - we have 1 plain roads in between the 2 cranked rods. Not sure If your referring to the same

@ Balaji - We haven't put the mats. Tapes were put inbetween the metal sheets to plug the gaps and some oil was brushed on the sheets.
Attachments
Materials for moulding
Materials for moulding
Materials for moulding.jpg (354.2 KiB) Viewed 6873 times
Moulding in Progress
Moulding in Progress
Moulding in progress.jpg (382.84 KiB) Viewed 6873 times
Regards,
Martin
m_d1982
Posts: 137
Joined: January 13th, 2012, 2:10 pm

Re: Finally Started my construction a Duplex 30X50 site in E

Post by m_d1982 »

Stage 2 completed. Will post the construction summary soon.
Attachments
Moulding 2
Moulding 2
moulding 2.jpg (263.13 KiB) Viewed 6872 times
Moulding 1
Moulding 1
moulding 1.jpg (339.9 KiB) Viewed 6872 times
Regards,
Martin
mcneha
Posts: 34
Joined: July 15th, 2013, 10:52 am

Re: Finally Started my construction a Duplex 30X50 site in E

Post by mcneha »

Hi Mr.Martin!

I'll try to explain you in a best possible way. Since you have already completed the concreting, it may help you or others who try to learn from this forum.
(Really worried of engineering being neglected).

You have clearly mentioned that there is a plain rod in between two cranked rods. Please understand that the crank rods are at top level where as the plain rods are at bottom level. In between two cranked rods, an extra plain piece of rod at the level of the cranked rods are to be added throughout. These rods are the important rods which take care of bending moment of slabs near supports :roll:. Bar benders understand them as "extra bars" :roll:

Regards
CHANDRASEKAR
ramki067
Posts: 246
Joined: October 7th, 2009, 10:07 am

Re: Finally Started my construction a Duplex 30X50 site in E

Post by ramki067 »

mcneha wrote:Hi Mr.Martin!

I'll try to explain you in a best possible way. Since you have already completed the concreting, it may help you or others who try to learn from this forum.
(Really worried of engineering being neglected).

You have clearly mentioned that there is a plain rod in between two cranked rods. Please understand that the crank rods are at top level where as the plain rods are at bottom level. In between two cranked rods, an extra plain piece of rod at the level of the cranked rods are to be added throughout. These rods are the important rods which take care of bending moment of slabs near supports :roll:. Bar benders understand them as "extra bars" :roll:

Regards
CHANDRASEKAR
Hi chandrashekar,
One basic question.
What are cranked rods and plain rods?
Can you show a pic of how the rods should be placed?

Thanks,
Ramki
m_d1982
Posts: 137
Joined: January 13th, 2012, 2:10 pm

Re: Finally Started my construction a Duplex 30X50 site in E

Post by m_d1982 »

mcneha wrote:Hi Mr.Martin!

I'll try to explain you in a best possible way. Since you have already completed the concreting, it may help you or others who try to learn from this forum.
(Really worried of engineering being neglected).

You have clearly mentioned that there is a plain rod in between two cranked rods. Please understand that the crank rods are at top level where as the plain rods are at bottom level. In between two cranked rods, an extra plain piece of rod at the level of the cranked rods are to be added throughout. These rods are the important rods which take care of bending moment of slabs near supports :roll:. Bar benders understand them as "extra bars" :roll:

Regards
CHANDRASEKAR

Hi Chandrasekar - The roof slab steel work has been completed as per the structural engineers drawings.. I also had my uncle verify the entire thing before the concerte work started.
Attachments
Roof Slab GF.pdf
GF Roof Slab drawing.
(417.36 KiB) Downloaded 582 times
Regards,
Martin