Building our dream house
Re: Building our dream house
No we did not purchase log. We had ordered teak wood of size 8 x 4 feet which is not standard. Hence mill guy said they will cut the log and show us the pieces for selection. Honne wood was already in cut pieces.
Re: Building our dream house
So as told earlier I am giving the break up of the wood buying
Wood type. Size. Quantity.(cu ft) Price. Unitprice
Honne. 6x4. 7.33 17959. 2450
Honne. 5x3. 40.83. 91868. 2250
Teak. 6x3. 2.75. 10450. 3800
Teak. 8x4. 5.55. 28860. 5200
Total 56.46 cubic feet
Planning charges 5650 (100 rs per cubic feet)
That, design and cement groove. 6775 (120 rs per cu ft)
Gst 18%
So actual price as per cubic ft came to 1.88 lakhs. We got a exemption of 13k at end and we got a bill of 1.75 lakhs.so how we distribute those 13k to wood price is left to us as 13k distributed to that 56 cubic feet will come to massive 232 rs per cubic feet.
So highlights
1) Prices of wood of standard size and non standard sizes vary a lot. As shown above. So if you are on budget go for standard sizes.
2) planning and that&design charges are 100 rs per cubic ft as standard
3) Taxes are 18%.but at what bill. That is negotiable.
4) honne quality is standard everywhere. If you want peace of mind wrt quality go for honne.
5) All other woods please double check on each log multiple times.
6) Bevu was available at 750. But quality needs to be checked.
7) as one of group member saran pointed out , we took all beadings with us. But carpenter said that beadings if used immediately will be used if not if it dries nails will not sit up.
8) As I said earlier knowing wood measurements is the most key part .
Wood type. Size. Quantity.(cu ft) Price. Unitprice
Honne. 6x4. 7.33 17959. 2450
Honne. 5x3. 40.83. 91868. 2250
Teak. 6x3. 2.75. 10450. 3800
Teak. 8x4. 5.55. 28860. 5200
Total 56.46 cubic feet
Planning charges 5650 (100 rs per cubic feet)
That, design and cement groove. 6775 (120 rs per cu ft)
Gst 18%
So actual price as per cubic ft came to 1.88 lakhs. We got a exemption of 13k at end and we got a bill of 1.75 lakhs.so how we distribute those 13k to wood price is left to us as 13k distributed to that 56 cubic feet will come to massive 232 rs per cubic feet.
So highlights
1) Prices of wood of standard size and non standard sizes vary a lot. As shown above. So if you are on budget go for standard sizes.
2) planning and that&design charges are 100 rs per cubic ft as standard
3) Taxes are 18%.but at what bill. That is negotiable.
4) honne quality is standard everywhere. If you want peace of mind wrt quality go for honne.
5) All other woods please double check on each log multiple times.
6) Bevu was available at 750. But quality needs to be checked.
7) as one of group member saran pointed out , we took all beadings with us. But carpenter said that beadings if used immediately will be used if not if it dries nails will not sit up.
8) As I said earlier knowing wood measurements is the most key part .
Re: Building our dream house
Wood measurement in Cubic feet
Calculating cubic feet for different units (formulae)
From feet: length (ft) × width (ft) × height (ft) = cubic feet
From inches: length (in) × width (in) × height (in) ÷ 1728 = cubic feet(most recommended one )
From yards: length (yd) × width (yd) × height (yd) × 27 = cubic feet
From cm: length (cm) × width (cm) × height (cm) ÷ 28316.85 = cubic feet
From meters: length (m) × width (m) × height (m) × 35.314667 = cubic feet
Calculating cubic feet for different units (formulae)
From feet: length (ft) × width (ft) × height (ft) = cubic feet
From inches: length (in) × width (in) × height (in) ÷ 1728 = cubic feet(most recommended one )
From yards: length (yd) × width (yd) × height (yd) × 27 = cubic feet
From cm: length (cm) × width (cm) × height (cm) ÷ 28316.85 = cubic feet
From meters: length (m) × width (m) × height (m) × 35.314667 = cubic feet
Re: Building our dream house
We will be buying electrical items (conduit items ) directlty from VIP factory this week. Will update on it this Saturday.
Re: Building our dream house
Thanks Rashmi , if your in Bangalore North - Can you share the number of contractor & saw mill
Re: Building our dream house
Contractor - labour contractor ?
Saw mill contact
Durga enterprises,
Near varun motors,
Hesaraghatta main road,
Bagalagunte , bengaluru 73
Contact
Hardik,
7795369192
Saw mill contact
Durga enterprises,
Near varun motors,
Hesaraghatta main road,
Bagalagunte , bengaluru 73
Contact
Hardik,
7795369192
Re: Building our dream house
Hi Rashmi,
I have really good quality wooden furtiveness that I plan on upcycling. Would you happen to know a good skillful carpenter who charges reasonably for upcycling
I have really good quality wooden furtiveness that I plan on upcycling. Would you happen to know a good skillful carpenter who charges reasonably for upcycling
Re: Building our dream house
I have 2 carpenter details. One referred by our family fruend and another who had renovated our Waldroof. The second guy work is good, but bit costly. First guy since he came through reference ,we believe he should be good. We don't take reference unless we know the person referring has built houses and trustable. Have pmed you both their numbers.
Re: Building our dream house
Thanks a ton
Re: Building our dream house
Today's JSW steel prices
8mm - 70k
10mm - 68.5k
12-20mm - 67.5k
8mm - 70k
10mm - 68.5k
12-20mm - 67.5k