BESCOM temporary connection monthly charges
Re: BESCOM temporary connection monthly charges
The cost has increased since last month...160 units @ 2KVA now costs 142x (x = do not remember).
Re: BESCOM temporary connection monthly charges
@m3_07, thanks for that piece of info.
-
- Posts: 191
- Joined: February 14th, 2012, 6:22 pm
Re: BESCOM temporary connection monthly charges
Hi San,
Temperory connection is similar like commercial connection charge. Permenant will be lesser.
I think the temp. connection chargese will depend upon the load you have requested for (KVA). I hope there won't be difference between 3 phase & single phase on monthly bill its all depend on the load.
I had bitter experience to pay bill at BESCOM mahadevapura office after 2 to 3 days visit to get signature from JE. From this experience onwards I don't want to step into any BESCOM office for paying EB bill. I will pay extra 100 Rs to get it done by third person itself. Its depends area to area & whom you meet & your time.
-Pradeep
Regards,
Pradeep
Temperory connection is similar like commercial connection charge. Permenant will be lesser.
I think the temp. connection chargese will depend upon the load you have requested for (KVA). I hope there won't be difference between 3 phase & single phase on monthly bill its all depend on the load.
I had bitter experience to pay bill at BESCOM mahadevapura office after 2 to 3 days visit to get signature from JE. From this experience onwards I don't want to step into any BESCOM office for paying EB bill. I will pay extra 100 Rs to get it done by third person itself. Its depends area to area & whom you meet & your time.
-Pradeep
Regards,
Pradeep
Re: BESCOM temporary connection monthly charges
I agree Pradeep. In fact to reduce such hassles I was determined to go for a 56 day renewal option but then balked looking at the upfront costs (deposit is doubled and apparently there is no option to refund the deposit at the end or even to adjust it against the deposit for a permanent connection which sounds absurd to me). And the electrician discouraged me from going for the 56 day renewal as well - perhaps more opportunity for making money
-
- Posts: 191
- Joined: February 14th, 2012, 6:22 pm
Re: BESCOM temporary connection monthly charges
my personel suggestion, don't go for 56 days.
Pradeep
Pradeep
-
- Posts: 250
- Joined: October 24th, 2010, 6:37 pm
Re: BESCOM temporary connection monthly charges
I have a single phase temporary connection with 28 days renewal. The JE is always not around and I should visit mutiple times to get his signature. I stay in Chandapura area. Looks like all JE's are the same across BESCOM.
Re: BESCOM temporary connection monthly charges
1. The form can be signed by anyover above the level of JE - meaning AE/ EE & So on. Sometimes, there are instances, where the boys will sign as "FOR JE" with a stamp too.
2. Collect the mobile number of the JE & chase him to his location...I did this twice. No harm in doing this.
2. Collect the mobile number of the JE & chase him to his location...I did this twice. No harm in doing this.
Re: BESCOM temporary connection monthly charges
Hi Pradeep, I did not but wanted to. Just checking: you suggest that because of the hefty deposit? Or is there something else to watch out for?pradeepecr wrote:my personel suggestion, don't go for 56 days.
Pradeep
Re: BESCOM temporary connection monthly charges
If I want to get a BESCOM temp connection for my site, is there any requirement that plan needs to be approved? I just got borewell done in my site and wanted to check when is the earliest I can get to buying and installing the pump.
-
- Posts: 191
- Joined: February 14th, 2012, 6:22 pm
Re: BESCOM temporary connection monthly charges
Hi San,
I just told because of hefty deposit for 56 days.
Hi giri,
For temp connection, You may need to have kind of watchman shed or small room constructed. Thats what my electrical contractor told me.
-Pradeep
I just told because of hefty deposit for 56 days.
Hi giri,
For temp connection, You may need to have kind of watchman shed or small room constructed. Thats what my electrical contractor told me.
-Pradeep