Realistic time to build a 4 bhk on a 30-40

blr78
Posts: 35
Joined: March 10th, 2021, 9:28 pm

Re: Realistic time to build a 4 bhk on a 30-40

Post by blr78 »

Thanks Visualizer. Been reading your posts in other threads too. Very informative
Btw small correction. Its a 30 50, but the plan is the same (g+2, 4 bhk own use). ( Dropped the 30 40 one since there were some issues in the papers). The timelines estimate you gave scares me. Does planning really need 4 to 6 months?. I know there is no standard answer for this since it depends on a lot of things. I agree with you on the typical boxy house thing. Most of the contractors assume, its going to be that kind of design.
sunil18vns
Posts: 61
Joined: February 10th, 2013, 10:06 am

Re: Realistic time to build a 4 bhk on a 30-40

Post by sunil18vns »

Rental house should not take more than 9 months...i built in 8 months gplus 3 in Whitefield