My house is built but I am yet to do plastering in front of house and want some architect/engineer assistance in front elevation. The thing is the engg who did the plan structure and BBMP approval was a cheat and I don't have the plans available so can share the photos of house or even take the person to site personally if they can give assistance at a cost.
If there is anyone do let me know.
Front elevation assistence
-
- Posts: 48
- Joined: September 30th, 2016, 6:31 pm
Re: Front elevation assistence
You can post pic of your house where front elevation is to be done. Have a 3d elevation creator ( architect) can do for you as concept. If you can draw a measurements in a paper ( hand sketch). It will be useful. Then get a details with a engineer + skilled mason can solve your issue.
-
- Posts: 48
- Joined: September 30th, 2016, 6:31 pm
Re: Front elevation assistence
Dear asuraja,
You have mentioned the guy has cheated you. Can you elaborate how and don't and does advice with your experience for the knowledge of the this form.
You have mentioned the guy has cheated you. Can you elaborate how and don't and does advice with your experience for the knowledge of the this form.
Re: Front elevation assistence
There are architects who can create 3D elevation. It would be easy if you have autocad drawing. Else they can manage with few pics and a site visit. As far as i know, basic charges are 5000 and 2000 extra for additional concepts.
I found one by searching in justdial near by locality.
I found one by searching in justdial near by locality.
Last edited by navhe on October 17th, 2016, 9:29 pm, edited 1 time in total.
- ardesarchitects
- Posts: 1080
- Joined: June 20th, 2009, 2:12 pm
Re: Front elevation assistence
Hi ,Ausraja
Elevations are not generally designed at the end of the construction, it should have been dealt holistically while floor planning is done.
Further if you can share pics on forum members can help you out with ideas. Just make sure you dont start with plastering before you have complete elevation details in hand to avoid any further compromises.
Regards ,
Ar.Praveen.N
Ardes Architects and Interior designers
ardesarchitects@gmail.com
https://www.facebook.com/ardes.architects
http://www.ardesarchitects.com
Elevations are not generally designed at the end of the construction, it should have been dealt holistically while floor planning is done.
Further if you can share pics on forum members can help you out with ideas. Just make sure you dont start with plastering before you have complete elevation details in hand to avoid any further compromises.
Regards ,
Ar.Praveen.N