Hi all
Iam about to start construction. I wanted to know approx cement consumption (no. of bags of required) and sand consumption (no.of loads/cft required) for a 30 chaddara house ( G+2 floors). This is required in order to do rough estimation of the budget for the construction materials.
Any thumb rule is also fine for me.
Cement and Sand estimation
-
- Posts: 4
- Joined: November 15th, 2009, 1:34 pm
Re: Cement and Sand estimation
You can estimate 900 - 1000 bags of cement and around 60Unit [1 Unit is 100cft] sand.
-
- Posts: 12
- Joined: March 20th, 2015, 1:09 pm
Re: Cement and Sand estimation
Around 90 to 100 bags for moulding on 1200 sft site can be taken as thumb rule.
Sridhar
BuildHomeSmart.com
Sridhar
BuildHomeSmart.com