House construction in 30x40 Site

kraghum
Posts: 152
Joined: October 8th, 2012, 4:28 pm

Re: House construction in 30x40 Site

Post by kraghum »

Hi

Few suggestion about the ground floor plan, by having steps projecting to living room you are going to give away that area. it also reduces overall feel of living area being bit large. pls see if you can push it back towards Kitchen so that it will be plain wide area across living room

my house construction is in coffee board layout, Hebbal Kempapura. i have given item rate contract to Architect and Engineer from same firm
hegdehn
Posts: 12
Joined: October 17th, 2013, 5:42 pm

Re: House construction in 30x40 Site

Post by hegdehn »

Dear kraghum,
Thank you very much for your suggestion. Small clarification, are you suggesting to move the living area towards Kitchen. In that case where to place the Kitchen ?
Also, please suggest if it is wise to make the Dining area double height ( open above) so that first and second floor are connected. How are your Architect and Engineer ?. Can I have their details.
kraghum
Posts: 152
Joined: October 8th, 2012, 4:28 pm

Re: House construction in 30x40 Site

Post by kraghum »

Hi

sorry if my commenct did't made sense, attached is screen shot from my plan. please check how the steps are pushed in to kitchen rather projecting our in to dining hall
if it was projectd or extended to dining it would have taken space from dining and also would affect the movement withing Dining hall
Attachments
gflorr.PNG
gflorr.PNG (10.06 KiB) Viewed 9322 times
hegdehn
Posts: 12
Joined: October 17th, 2013, 5:42 pm

Re: House construction in 30x40 Site

Post by hegdehn »

Dear kraghum,
Thank you . This is very useful .
hegdehn
Posts: 12
Joined: October 17th, 2013, 5:42 pm

Re: House construction in 30x40 Site

Post by hegdehn »

Dear mohanvk,

The suggestion made by you is very apt, thank you for the same.
eCUBE
Posts: 20
Joined: April 11th, 2013, 11:43 am
Contact:

Re: House construction in 30x40 Site

Post by eCUBE »

Hello everyone,

This is not commercial post! Members need to contribute to the shared knowledge and wisdom to make live and enriching experience for everyone.

Sir, House construction in Bangalore, can be very expensive if we go buy traditional means of construction. The building material cost, contractor follow ups, missing deadlines, politics of Sand, Bricks, adding two side plaster, ensuring quality and durability; all these processes are very cumbersome procedures. The quotes which I have seen here is very expensive and labour intensive.

We work in similar construction field, and years of experience suggests us that we need to apply new improved technology for our old traditional problems. Constructing home is not an easy task. There are numerous DISADVANTAGES OF BRICK MASONRY wall.
1- It is time consuming, requires Cement, Clay Brick, contains harmful Asbestos, and water and energy to curing process
2- 10ftx10ft wall construction takes 2 full week, including labour time, curing, and availability and other uncertainty due to contractors schedule
3- Brick walls are non insulating. The indoor temperature keeps fluctuating, keeping discomfort.
4- In Brick Wall construction, Air Conditioning cost is high due to indoor temperature variations, costs more on Energy Bills during summers
5- Brick wall with painted surfaces internally, carries harmful volatile organic compounds (VOC) and Asbestos (even in AAC blocks) that keeps getting released in our indoor environment, causing lung or Skin cancer related diseases.
6- Lot of site debris and chemical waste during the construction

These are established facts.

We have worked with Pre-engineered Buildings (PEB) using LGS steel structure (for upto G+4) and have designed low-cost and efficient buildings. This is very cost-effective solution for our internal and external wall construction. It includes all preassembled requirements. The sandwhich panels or insulated EPS panels includes all the integrated electrical and plumbing fixtures, ready to use on site at any time.

Some of the best features of the Fiber Cement, Sandwich panels compared to the traditional Brick walls
1_Saves Time, Money, and materials
2_10x10 ft wall can be constructed within 2Hours.
3_Complete Insulation solution
4_Saves on AC, due high low U value rating. Clinically testes and certified Panels
5_Asbestos Free and NO VOC
6_Zero or less Waste. Its a clean working. No water required

I am including some of our projects photos in Kochin and Bangalore. If you are interested to use these panel, LGS PEB structure, we would be happy to assist you. You can think before you make an Investment Call on Building Wall Construction.
Thank you for your Kind attention.

Regards,
eCUBE Solution
+91 9560035231
Attachments
LGS stessl PEB-5 Weeks Completion
LGS stessl PEB-5 Weeks Completion
Frbre Board Panel02.jpg (28.5 KiB) Viewed 9169 times
Villa House
Villa House
Frbre Board Panel03.jpg (30.77 KiB) Viewed 9169 times
mail2vivek
Posts: 23
Joined: June 16th, 2013, 8:14 pm

Re: House construction in 30x40 Site

Post by mail2vivek »

Sir,

All bedroom at 2nd floor may not be very idea. The study room can be shifted to 2nd floor and one bedroom with attached bathroom in first floor itself.
My feedback is its difficult for aged family members (parents) to use the bedroom at second floor as they need to use the staircase.
If possible you think of converting pooja room as attached bathroom in first floor and pooja room can be shifted to utility space.
hegdehn
Posts: 12
Joined: October 17th, 2013, 5:42 pm

Re: House construction in 30x40 Site

Post by hegdehn »

Dear Vivek,

Thank you for your inputs.
newbie81
Posts: 31
Joined: May 28th, 2014, 8:28 pm

Re: House construction in 30x40 Site

Post by newbie81 »

Hi Hedge,
Probably by this time ,your house construction might have much progress.I am planning to start the construction of my house .

May use your best practices and lessons learnt if any

currently below are my queries
1) Are u decided for bricks or concrete blocks ?
2)For Sump ,have you decided for rcc or brick based ?

I understand your plan is of approx 3000+ sqft ..what is the capacity of sump have you planned?

Best Regards
hegdehn
Posts: 12
Joined: October 17th, 2013, 5:42 pm

Re: House construction in 30x40 Site

Post by hegdehn »

Hello newbie81,

Due to some unavoidable reasons I had to defer my home construction. However, I hope to start the same in about 2 months time from now. I have scheduled drilling of bore well this week . I would share my experiences once construction starts.

I did some home work and have decided to go for concrete blocks keeping in mind that these are space efficient ( It was suggested to me to go for 6" blocks for external walls and 4" blocks for internal walls) . I have decided to go for reputed brands like APCO.

About sump, I am yet to decide.
Post Reply

Return to “Civil Construction”