POORNA CHANDRA LAYOUT (OPP TO BENAKA LAYOUT) NELAMANGLA

Post Reply
deepakgoura
Posts: 2
Joined: October 1st, 2012, 6:21 pm

POORNA CHANDRA LAYOUT (OPP TO BENAKA LAYOUT) NELAMANGLA

Post by deepakgoura »

HELLO

LOOKING FOR SITE OWNERS OF POORNA CHANDRA LAYOUT (OPP TO BENAKA LAYOUT),KUNIGAL CIRCLE, KEMPALINGANA HALLI NELAMANGLA, SO THAT JOINT CONSTRUCTION WORK CAN BE STARTED , AS NOW SHORTLY FOLLOWING DEVELOPMENTS WILL BE IN PLACE

1) NELAMANGLA RAILWAY STATION IS UPCOMING
2)RAIL LINE PASSING INFRONT OF BENAKA LAYOUT


POSITIVE POINTS

Key Point One should look for Construction
1) Close to 1 KM From Kunigal Circel
2) 1.5 KM from proposed Nelamangala Railway Station
3)0.5 KM from proposed Hassan Tumkur Rail Line
4) Immediate Construction is possible
5)Adjacent a Villa being constructed
6)Very suitable for people working , near,Nelamangla ,tumkur ,kunigal belt

THANKS
DEEPAK
09886281994
Last edited by deepakgoura on October 2nd, 2012, 5:42 pm, edited 1 time in total.
deepakgoura
Posts: 2
Joined: October 1st, 2012, 6:21 pm

Re: POORNA CHANDRA LAYOUT (OPP TO BENAKA LAYOUT) NELAMANGLA

Post by deepakgoura »

HELLO

LOOKING FOR SITE OWNERS OF POORNA CHANDRA LAYOUT (OPP TO BENAKA LAYOUT),KUNIGAL CIRCLE,KEMPALINGANA HALLI NELAMANGLA, SO THAT JOINT CONSTRUCTION WORK CAN BE STARTED , AS NOW SHORTLY FOLLOWING DEVELOPMENTS WILL BE IN PLACE

1) NELAMANGLA RAILWAY STATION IS UPCOMING
2)RAIL LINE PASSING INFRONT OF BENAKA LAYOUT

POSITIVE POINTS OF POORNACHANDRA LAOUT
1) Close to 1 KM From Kunigal Circel
2) 1.5 KM from proposed Nelamangala Railway Station
3)0.5 KM from proposed Hassan Tumkur Rail Line
4) Immediate Construction is possible
5)Adjacent a Villa being constructed
6)Very suitable for people working , near,Nelamangla ,tumkur ,kunigal belt

THANKS
DEEPAK
09886281994
Post Reply

Return to “BMRDA Approved”