Re: Any good electrician in Hosa road area
You can contact. Mr Rajesh 9945439339
- April 17th, 2015, 11:46 pm
- Forum: Civil Construction
- Topic: Gauribidanur sand
- Replies: 2
- Views: 3987
Re: Gauribidanur sand
Gouribidnur sand or from anywhere should use river sand instead of filter or mixed sand , since the clients are non technical they can say some good words and impress when come to reality its totally different story, M sand cant be used for plastering as well as block work, it can be only used for c...
- January 6th, 2015, 11:22 pm
- Forum: Site for sale
- Topic: 20x30 BDA site sale JP Nagar 9th phase, I Block
- Replies: 1
- Views: 3814
Re: 20x30 BDA site sale JP Nagar 9th phase, I Block
is this site still available
- October 9th, 2014, 12:07 am
- Forum: Civil Construction
- Topic: COntractor reference to construct boundary wall for a plot
- Replies: 17
- Views: 20129
Re: COntractor reference to construct boundary wall for a pl
Hi - Can you please recommend some good and reliable contactors to construct a boundary wall for a plot in north bangalore? hi, i suggest to you to freeze basic requirement items and activities. Material -- 1.solid block 8" or 6" ( 4" not advisable since it may not be strong) 2. precast walls heigh...
- June 27th, 2014, 1:07 pm
- Forum: Civil Construction
- Topic: Cnstructn on 30x40 plot(Ground Floor) Need advice on estmtn.
- Replies: 8
- Views: 7755
Re: Cnstructn on 30x40 plot(Ground Floor) Need advice on est
hi shivashashi I agree with Mr. praveen if plan , elevations , structural details are ready or freeze the requirement first . once details are ready my suggestion is please ask him to provide the quote with quantity and rate for all works including basic cost of materials and make or brand of the sa...
- November 18th, 2013, 2:10 am
- Forum: Material prices
- Topic: Ground floor roof slab.
- Replies: 4
- Views: 4029
Re: Ground floor roof slab.
hi all side shuttering can be removed after 24 hours. but slab shuttering removal depends on the length of of slab if the slab length is more than 4.5 mtr with out any beam, slab shuttering should be removed after 14 days if less than 14 mtr shuttering can be removed after 7 days by providing jack s...
- November 15th, 2013, 11:52 pm
- Forum: Civil Construction
- Topic: Review my Building Spec/Quote @1400 for basic Construction
- Replies: 6
- Views: 7808
Re: Review my Building Spec/Quote @1400 for basic Constructi
hi pals 78 MS staircase for overhead tank will be part of contract, if the RCC staircase is outside of slab area then the it should be considered as 1 square or 100 sft in your case it will be inside of building. why i said 12000 means 1 tanker load contains 6000 ltrs, so when you want to water from...
- November 15th, 2013, 5:17 am
- Forum: Civil Construction
- Topic: Review my Building Spec/Quote @1400 for basic Construction
- Replies: 6
- Views: 7808
Re: Review my Building Spec/Quote @1400 for basic Constructi
hi pals78 we should be really thankful to My BDA site ADMIN guys for proving opportunity to share knowledge, I reviewed your quote and specification with plan . I am sharing my knowledge for my best This may really help all other readers too the price you got per square is very good and best , but n...
- November 15th, 2013, 2:17 am
- Forum: Civil Construction
- Topic: construction methods for bathrooms in FF and SF.
- Replies: 4
- Views: 22237
Re: construction methods for bathrooms in FF and SF.
hi, as Mr aries said the toilet level should be at least 12mm down by floor level of bedroom or hall it should not be above bedroom level proper sunked to be provided on slab itself while designing the slab , sunken should be treated by waterproof course up to 1 feet above the floor level so that yo...