There is nothing to panic about the water in your foundation pits. But it looks like the sub-soil is clay. You have to bring it to the notice of your structural engineer and foundation need to be accordingly designed.
Regards.
CHANDRASEKAR
Search found 34 matches
- December 12th, 2014, 5:40 pm
- Forum: Civil Construction
- Topic: Water in Foundation Pit
- Replies: 5
- Views: 6143
- October 27th, 2014, 9:20 pm
- Forum: Civil Construction
- Topic: Our House construction experience
- Replies: 115
- Views: 114241
Re: Our House construction experience
Hi ravivasudeva!
Connecting the compound columns to main building's plinth beam will not help in retaining the earth. I posted my view to you on 1st October for which you had replied. Please, please, please take care of construction. Never hurry up certain works.
Regards.
CHANDRASEKAR
Connecting the compound columns to main building's plinth beam will not help in retaining the earth. I posted my view to you on 1st October for which you had replied. Please, please, please take care of construction. Never hurry up certain works.
Regards.
CHANDRASEKAR
- October 1st, 2014, 4:53 pm
- Forum: Civil Construction
- Topic: Our House construction experience
- Replies: 115
- Views: 114241
Re: Our House construction experience
Hi Mr.Ravivasudeva! Please never do civil works in a haste. The earth filling need to be executed layer by layer. You can fill up loose soil to a maximum extent of one foot depth, then you have to do proper consolidation either by watering or by mechanical means or by both. You need to repeat this p...
- August 16th, 2014, 10:39 am
- Forum: Civil Construction
- Topic: Recommended height for front entrance gate (MS Steel)?
- Replies: 3
- Views: 4158
Re: Recommended height for front entrance gate (MS Steel)?
Hi!
If the gate has enclosures then minimum 7'0" should be the height. If not, a minimum of 5'6" is required. It all depends on the compound height, portico or fixed grill height above the gate, the vehicle you possess etc.,
Regards.
CHANDRASEKAR
If the gate has enclosures then minimum 7'0" should be the height. If not, a minimum of 5'6" is required. It all depends on the compound height, portico or fixed grill height above the gate, the vehicle you possess etc.,
Regards.
CHANDRASEKAR
- August 8th, 2014, 7:10 pm
- Forum: Announcements
- Topic: Complaints / Reporting to ADMINS
- Replies: 2
- Views: 13407
Re: Complaints / Reporting to ADMINS
Hi!
May I know why are my posts delayed now-a-days?
Regards.
CHANDRASEKAR
May I know why are my posts delayed now-a-days?
Regards.
CHANDRASEKAR
- August 8th, 2014, 2:27 pm
- Forum: Civil Construction
- Topic: Earth Filling
- Replies: 6
- Views: 7584
Re: Earth Filling
Hi!
Foundation in clay needs special care. Best way is to take your structural engineer personally to the site.
Regards.
CHANDRASEKAR
Foundation in clay needs special care. Best way is to take your structural engineer personally to the site.
Regards.
CHANDRASEKAR
- August 8th, 2014, 2:19 pm
- Forum: Civil Construction
- Topic: SSM required for front gating area
- Replies: 4
- Views: 5018
Re: SSM required for front gating area
Hi tendlu!
SSM or BBM is fine, provided you are taking care for the drain slab support.
Regards.
CHANDRASEKAR
SSM or BBM is fine, provided you are taking care for the drain slab support.
Regards.
CHANDRASEKAR
- August 7th, 2014, 4:04 pm
- Forum: Civil Construction
- Topic: SSM required for front gating area
- Replies: 4
- Views: 5018
Re: SSM required for front gating area
Hi tendlu!
Since it is almost the last stage of work, you can do it either with left over bricks or with left over size stones. Take care for the placement of drain covering in front of the gate.
Regards.
CHANDRASEKAR
Since it is almost the last stage of work, you can do it either with left over bricks or with left over size stones. Take care for the placement of drain covering in front of the gate.
Regards.
CHANDRASEKAR
- August 3rd, 2014, 11:58 am
- Forum: Civil Construction
- Topic: Help required to analyze the contractor's commission
- Replies: 7
- Views: 7197
Re: Help required to analyze the contractor's commission
Hi! Saying "commission" may not be an appropriate word for these type of works. India's No.1 construction group also undertakes work on this method. It is known as "Actual Cost Plus Works" and charges levied are termed as liasioning charges. I had executed works for even corporates on this method of...
- August 1st, 2014, 4:02 pm
- Forum: Civil Construction
- Topic: SSM required for front gating area
- Replies: 4
- Views: 5018
Re: SSM required for front gating area
Hi!
Doing SSM below the gate, purely depends on the level difference between the road in front of the gate and the area just inside the gate. If more filling is there then SSM is required or else, BBM is enough.
Regards.
CHANDRASEKAR
xxxxxxxxxxxxxxxxxxx
Doing SSM below the gate, purely depends on the level difference between the road in front of the gate and the area just inside the gate. If more filling is there then SSM is required or else, BBM is enough.
Regards.
CHANDRASEKAR
xxxxxxxxxxxxxxxxxxx